Original source · versioned page text
SUPERSEDED NEGOTIATED - OPW25 0042 - REFERENCE DOCUMENT (As Published)
Very large file (18.6 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Original PDF page 15, section 1. The text section number identifies this passage in the reader.
FIGURE 2.5: FREEBOARD ASSESSMENT
2.2.1.3 Channel and Culvert Scour Protection
The maximum velocity in the proposed culvert outlet is 2.10 m/s. As such, scour protection is recommended in accordance with the
Queensland Urban Drainage Manual. This guideline recommends rock size D50 = 200mm and extend 3.6m past the outlet.
Velocities within the flow path are generally less than 2.0m/s, however, there a section between the foot bridge and Serenity Close, where
the velocities are up to 2.30 m/s. It is recommended that reinforced turf is considered in this section of the channel (approx. CH150 to 170).
DocumentNOOSA
Set ID:CALILE I BBNE01676-0001-REP-001-1
23806878 12
Version: 0, Version Date: 01/01/1900
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.