2019-10-28 Special Meeting Agenda - Item 1 - Attachment 3 - RAL18-0023 - Master Plan Stage 1
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnCHOOSING FUTURES: Shire Business Centre Master Plan - Stage 1 17
SUB- PRIMARY SECONDARY OBJECTIVE STRATEGIC PLAN INTENT & PERFORMANCE STANDARDS
PRECINCT FUNCTION FUNCTION PROVISIONS (with
direct influence)
B2 Business Transit, Civic Provision of principal 19.3.1.2,19.3.1.9, Sub-Precinct B2 comprises a major transit oriented precinct, supported by an office park. Along
& Office Park parking, parking access and 19.3.1.17, 19.3.1.18, with Sub-Precincts B1 and E1, Sub-Precinct B2 comprises the core of the Shire Business Centre
(2.7 ha.) transit centre facilities, 27.10.4.2, 27.10.4.3 site. Its functioning is critical to the successful operation of traffic management, parking schemes,
supported by civic and office shuttle movements and pedestrian movements through the overall site.
functions. a. Parking facilities servicing Sub-Precincts B1, B2, E1 and E2, with primary points of access
PROCESS PRINCIPLES: located along the loop system (R3 and R4).
Impact assessment – Material b. Major parking functions will be supported by a shuttle system primarily focussed on Sub-
changes of use (new Precincts B1, B2, E1 and E2, however the system will also service, though at a lower
development) frequency, other employment precincts and the RES Sub-Precinct.
Code assessment – Material c. With Sub-Precinct B1, Sub-Precinct B2 is expected to include key community and civic
changes of use (existing functions.
development) and d. Commercial and administrative office floor space up to 4,000m2.
reconfiguration (land)
e. The ratio of TUA (for all functions) to area of the sub-precinct up to 0.4:1.
f. Building heights of up to 2 storeys.
g. Development to have strong visual linkages and pedestrian and bikeway connectivity with
Sub-Precincts B1 and E2.
h. Development expected to be staged, consistent with development in Sub-Precincts B1, B2,
E1 and E2.
B3 Business Office & Provision of office and 19.3.1.2, 19.3.1.8, Sub-Precinct B3 potentially supports elf skink habitat. Its availability for primary and secondary
Showroom showroom facilities in an 19.3.1.9 functions is dependent on additional studies being undertaken in Stage 2 of the Master Plan.
Park (2.0 ha.) open modular setting. These studies will attempt to identify the extent of the population of the elf skink on the site and in
PROCESS PRINCIPLES: other parts of the locality, its habitat associations and its long-term viability on the site of the Shire
Business Centre. Should the habitat require retention, Sub-Precinct B3 would be rendered
Impact assessment – Material unsuitable for development and would revert to an Open Space Environmental sub-precinct.
changes of use (new
development) Sub-Precinct B3 provides opportunities for showroom and office facilities on the Shire Business
Centre site. Whilst some of these areas lie close to Eenie Creek Road, development will turn away
Code assessment – Material from that road. It is envisaged that development will occur in a park-like setting.
changes of use (existing
development and, subsequent a. Showroom/homemaker floor space up to 4,000m2.
to adoption of Stage 2 of the b. Commercial and administrative office floor space up to 3,000m2.
Master Plan, new development) c. The ratio of TUA (for all functions) to area of the sub-precinct up to 0.5:1.
and reconfiguration (land)
d. Building heights of generally 1 storey.
e. Development to have strong visual linkages to internal roads with no reliance on visual
association with Eenie Creek Road.
f. Vehicular parking will be provided on-site.
g. Development expected to be staged, however it is expected that there may be some capacity
on the site still available at 2007 for accommodation of the showroom floor space allocation.
J C:\Documents and Settings\oludvigsen\Local Settings\Temporary Internet Files\OLK7\Master Plan.doc Final, endorsed by Council 24/05/2001
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.