Appendix 9 - Detailed assessment against the Noosa plan
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn Column 1 Column 2 Column 3
Specific Outcomes Probable solutions Response
(if code assessable)
e) convey run-off to stormwater drainage in S8.2 As Constructed data is Complies
a manner that allows roads to be submitted in accordance with This can be conditioned as part of
trafficable in Q100 ARI local rainfall Section 6 of PSP5 Engineering the approval
events. Design Standards – Roads,
Drainage and Earthworks;
S8.3 Stormwater drainage Complies
planning, design and Refer to the stormwater
construction is in management report
accordance with the
Queensland Urban
Drainage Design Manual.
O9 Roads and stormwater drainage S9.1 Roads and stormwater Complies
infrastructure is constructed— drainage infrastructure is Refer to the traffic impact
a) in accordance with appropriate constructed in accordance assessment and stormwater
engineering standards; and with— management report
b) to minimise adverse environmental a) Sections 2, 3 and 4 of
impacts, including from run-off and PSP5 Engineering Design
erosion. Standards – Roads,
Drainage and Earthworks;
b) Queensland Design
Code for Residential
Streets;
c) AUSTROADS; or
d) A combination of the
principles in these
documents;
S9.2 Erosion and sediment control Complies
measures are designed and An erosion and sediment control
implemented in accordance with plan would be implemented prior to
the Institution of Engineers construction
Australia (Queensland Division)
Soil Erosion and Sediment Control
- Guidelines for Queensland
Construction Sites.
Environmental Protection
O10 Roads and stormwater drainage S10.1 Roads and stormwater N/A
infrastructure are located and aligned so as drainage follow the edge of
to— existing disturbed areas, or
a) minimise disturbance to native alternatively, these works are
vegetation and/or other habitat co-located within a combined
areas; utility corridor;
b) protect and maintain wildlife corridor
movements and the safety of native S10.2 Roads avoid native N/A
fauna; vegetation and provide for
c) minimise changes to the hydrological fauna underpasses and
regime, including drainage patterns, associated fencing where
run-off and water quality; appropriate;
d) avoid crossing watercourses, drainage
lines and wetlands, but where such S10.3 Road infrastructure N/A
crossings are unavoidable, disturbed within or adjacent to native
areas are reinstated and revegetated habitat incorporates fences
on completion of works; and which allow for protected
wildlife movement and controls
e) minimise bulk earthworks.
unrestricted access of domestic
cats and dogs;
S10.4 Native vegetation is N/A
protected from clearing or
construction activities
by—
a) clearly marking
vegetation to be retained
with flagging tap;
Part 14 – Assessment Criteria – Codes (The Noosa Plan) Page 22 of 28