Specific Outcomes Probable solutions Response
(if code assessable)
b) installing protective
fencing around the
dripline of vegetation;
and
c) ensuring stock piling,
storage and vehicle
parking occur outside the
areas of vegetation to be
retained;
S10.5 Low impact construction N/A
techniques are used around areas
of vegetation to be retained to
minimise interference with the
vegetation.
O11 Roads and stormwater drainage No solution provided Complies
infrastructure is proven to be suitable for its Refer to the traffic impact
use prior to Council accepting the dedicated assessment and stormwater
asset. management report
O12 Alignment of stormwater drainage S12.1 The location, design and Complies
infrastructure is to allow for easy access for construction of stormwater Refer to the stormwater
the ongoing maintenance by Council. drainage structures is in management report
accordance with Sections 4 and
5 of PSP5, Engineering Design
Standards - Roads, Drainage
and Earthworks;
S12.2 Where infrastructure is N/A
located on private land an
easement is dedicated over the
infrastructure in accordance with
Section 4 of PSP 5, Engineering
Design Standards – Roads,
Drainage and Earthworks.
14.147 Frontage works
O13 Development is provided with external S13.1 The following infrastructure Complies
roadworks along the full extent of the components already exist at the The site has existing connections to
frontage of the site to an appropriate frontage of the site or are all necessary urban services,
standard having regard to the specified provided at the developer’s including Council’s reticulated water
function of the road. expense— supply and sewerage disposal
full width sealed road; systems, stormwater infrastructure,
a) concrete kerb and channel bitumen sealed roads, electricity
where appropriate; and telecommunications.
b) forming and grading to Infrastructure charges would be
footpaths; provided in accordance with the
Charges Resolution (No. 3) 2018.
c) vehicular kerb and footpath
crossings;
d) a constructed bikeway;
e) a constructed footpath;
f) a constructed carriageway;
g) required alterations to
public utility mains,
services or installations;
h) construction of any
required alterations to
public utility mains,
services or installations;
i) stormwater drainage works;
and
j) installation of electrical
conduits;
Part 14 – Assessment Criteria – Codes (The Noosa Plan) Page 23 of 28
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.