PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 7 FEBRUARY 2017
b. All relevant Noosa Council Planning Scheme Policies, standard drawings,
standard specifications and guidelines, particularly PSP 5 – Engineering Design
Standards – Roads, Drainage and Earthworks.
c. The latest version of the Healthy Waterways document “Water Sensitive Urban
Design Technical Design Guidelines for South East Queensland” for all water
quality devices to be constructed on site.
Driveways
20. Driveway crossovers must be designed and constructed generally in accordance with
the approved plans and in accordance with IPWEA standard drawing RS- 051 and
must have levels and grades that match the levels, width (2m) and the grades of the
existing concrete footpath without creating trip hazards.
21. The following must be complied with during the construction of the required
crossovers/driveways:
a. The driveway width must not exceed 6m at the front boundary line and 9m at
the kerb line.
b. The driveway surfacing must consist of either an approved hot mixed asphaltic
concrete or patterned/plain concrete and must have a slip resistant surface.
c. The driveway must be constructed so as not to concentrate stormwater runoff
or ponding onto other properties and/or the road verge.
d. For public safety, the finish levels of crossover must ensure smooth transition to
existing surfaces such as the road grassed verge and existing concrete
pathway.
e. Where applicable, underground service conduits for water supply, electricity
and any other services must be provided as part of the access driveway works.
f. Have a minimum clearance not less than 500mm from the lentil of existing
stormwater drainage inlet pit.
g. Have a minimum clearance of 1.0m from any existing power poles, streetlights
or other signage.
h. Have a minimum clearance of 500mm from any Unitywater/Telstra asset,
unless a written approval is obtained from Unitywater/Telstra and submitted to
Council.
Pathway
22. A new 2.0m wide pathway must be constructed along the frontage of the site to
Vision Court and extended to the northern boundary of the adjoining lot to the south
in accordance with the following requirements:
a. Be generally in accordance with the approved plans and in compliance with the
higher order approval conditions and standard drawing IPWEAQ RS-065.
b. Footpath alignment must be amended where necessary to avoid conflict with
any existing obstructions (eg electricity power pole).
c. All paths, driveways and uncovered parking areas must have a slip resistant
surface.
d. Expansion and contraction joints must provide a flush finish. Installation of joints
by saw cutting is preferred to ensure a smooth ride for cyclists.
e. The works must include any modifications to existing service covers to ensure
the footpath finishes flush with all services and the like, so as not to create any
pedestrian safety hazard.
Page 20 of 125
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.