PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 7 FEBRUARY 2017
f. For public safety, new pathway must terminate in a manner that ensures
smooth transition to existing surfaces (eg grassed verge, existing adjoining
pathway).
g. Be designed and constructed to comply with the Disability Discrimination Act
(DDA), Access to Premises Standard, Austroads and relevant sections of
AS1428 Design for access and mobility.
23. Construction hold point(s) with Council’s delegate must be established once the
pathway is ready for concreting and/or as may be agreed to at the prestart meeting.
Pavement Design and Construction
24. Pavement design for privately owned works must be undertaken in accordance with
the relevant standards and be designed and constructed to comply with the Disability
Discrimination Act (DDA), Access to Premises Standard and relevant sections of
AS1428 Design for access and mobility. Structural integrity of the driveway and car
park areas will remain the responsibility of the property owner/developer and must be
certified by an RPEQ.
Works within Road Reserve and Reinstatement Works
25. Safe pedestrian access on all streets in the vicinity of the development must be
maintained at all times. Should footpath and/or road closures be necessary to carry
out construction works, Council’s Engineering Officer must be notified prior to the
proposed closure and all requirements complied with.
26. Where required, any reinstated road pavement must be in accordance with IPWEA
standard drawing RS-170 with road pavement resurfacing to consist of a minimum
depth of 50mm of an approved hot mixed asphaltic concrete.
27. Any existing kerb & channel and concrete footpath sections requiring removal due to
the new works must be saw-cut and removed to allow for a smooth and neat finish
with the new works.
Earthworks
28. All earthworks must be undertaken in accordance with the provisions of AS 3798
Guidelines on Earthworks for Commercial and Residential Development, with
geotechnical supervision and testing undertaken in accordance with Section 8 of the
Standard, and to a minimum of ‘Level 2’ as defined in Appendix B.
29. All Earthworks and construction works must be carried out taking into consideration
the protection of any existing above and below surface services, and the stability and
protection of fences and any buildings and structures on the adjoining properties.
Stormwater Drainage
30. Stormwater drainage for the site must be provided generally in accordance with the
approved plans and must be supervised by RPEQ and its compliance with the design
and the relevant standards be included in the completed works certification by the
RPEQ.
31. Works associated with this permit must not adversely impact on the existing drainage
conditions on other properties including road and public footpath by blocking or
interfering with overland flow path.
32. Construction of all internal stormwater drainage works must comply with the relevant
section/s of Australian Standard AS/NZS 3500.3.
Page 21 of 125
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.