Skip to the record
Mmm.. taste the original NoosaWatch™

Original source · versioned page text

2017-02-07 Planning and Environment Committee Agenda

of 125

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (19.2 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                               7 FEBRUARY 2017


The eastern half of Pine Street, extending from the intersection of the new internal loop road
(near lot 74) to the western side of lot 72 shall be upgraded to an External Urban Access Road
with a nominated design speed of 40km/hr. The road shall transition back to tie-in with the
existing pavement between lots 71-69.
Condition 65.1.7
The western half of Pine Street extending from the intersection of the new internal loop road
(near lot 74) to the western side of lot 72 shall be upgraded to an External Rural Local Road with
a nominated design speed of 40km/hr. The road shall transition back to tie-in with the existing
pavement between lots 71-69.
The applicant proposes the following grounds in support of the amendment application:
1.   Traffic generated by the Greenwood Grove Estate does not head west along Pine Street to
     Bagnalls Road Bridge (which crosses the Bruce Highway).
2.   Bagnalls Road (west of the Bruce Highway) services an existing rural residential
     subdivision and while this land has been included in the Urban Footprint under the SEQ
     Regional Plan, we understand that it is not intended to be included within the Council’s
     urban development area. Regardless, should that land be included within the urban
     development area any upgrade to Bagnalls Road or Pine Street should fall upon that
     development given it is that land which will be generating the additional traffic using
     Bagnalls Road and Pine Street.
3.   The proposed changes deliver the safest road design outcomes.
4.   Discussions with the adjoining landowner at 1 Bagnalls Road (Lot 1 RP111730) has
     indicated that they do not want kerb and channel along their frontage and wish to maintain
     the existing rural feel.
Assessment
The conditions of approval currently require Pine Street, the Pine Street / Bagnalls Road bend,
and Bagnalls Road north of the bridge over the Bruce Highway to be upgraded to an 8 metre
pavement width, with kerb and channel on the southern side of Pine Street and the eastern side
of Bagnalls Road (as well as a concrete footpath adjacent to the kerb and channel). The northern
side of Pine Street and western side of Bagnells Road are to have a bitumen edge.
The Pine Street / Bagnalls Road bend currently has a pavement width of about 6m, and has
advisory 40km/hr signage on each approach.
There is an existing path on the western side of the bridge across the Bruce Highway.
In their current form each condition nominates a different road classification for varying sections
of Pine Street with each road classification requiring a different design speed as per the below:
Condition 65.1.4 – External Urban Local Road = 50km/hr
Condition 65.1.5 – External Rural Collector Road = 60km/hr
Condition 65.1.6 – External Urban Access Road = 40km/hr
Condition 65.1.7 – External Rural Local Road = 60km/hr
The request to amend the design speed within each of these conditions to 40km/h is to give
affect to the applicant’s preference to not undertake improvement works to the Pine
Street/Bagnells Road Bend. A design speed of 40km/h will not require improvement works at the
Pine Street/Bagnells Road bend.
A review of the proposed changes has been undertaken by an external traffic consultant (Holland
Traffic Consulting Pty Ltd) who has advised:
     The current proposal by the applicant proposes not to undertake upgrading work to the
     Pine St / Bagnalls Rd bend, or to Bagnalls Rd at all. Nor does it propose to complete the
     concrete path around the bend or along Bagnalls Road.

                                                                                    Page 7 of 125
Log in to download the original file

2017-02-07 Planning and Environment Committee Agenda(PDF, 18MB).pdf · 19.2 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.