Town Water Supply
80. The site shall be connected to Council’s existing town water supply and be constructed in accordance with
Council’s standards and requirements at no cost to Council.
81. Each water connection to the water reticulation system shall extend to the property boundary and be
metered. Where multiple units including leased buildings are served by a single service, multiple water
meters to each individual unit or leased building shall be installed. All fees for the supply of water meters
shall be paid to the Council.
Service Easements (Sewer / Stormwater)
82. A registered easement shall be created over the ‘zone of influence’ of all sewers within the subject site
and over those parts of the subject site that are impacted upon by sewers on any adjoining sites. The
easements shall generally be parallel to and centred over the sewer main and be equivalent in width to
twice the depth to invert level of the sewer at the deepest point within the allotment (measured from the
finished surface) and be no less than 3.0m wide. In this regard a licensed surveyor shall accurately locate
all sewer mains and determine the necessary width of the easement, which shall be shown on any plans
submitted for Operational Works / Building Works approval. To this extent the surveyor shall certify that
the sewer and the zone of influence is wholly contained within the easement to be created.
In addition to this the Applicant’s Solicitor shall give Council’s Solicitor an appropriate undertaking in
writing that the Title Deed and the easement documents will be lodged at the Land Titles Office and any
additional Titles Office forms or requisitions requiring the consent of Council will be attended to promptly.
A duly executed copy of the easement shall be submitted to Council for perusal prior to the use
commencing.
Any changes required by Council’s Solicitor must be corrected immediately.
83. A registered easement shall be created over any stormwater drainage pipes within the site that collect
stormwater from a Council road or convey stormwater from any adjoining property (for example, where
drainage pipes are provided within the site to prevent adjacent properties from additional ponding/flooding
due to works on the subject site).
Headworks Contributions
84. Contributions shall be paid to Council in accordance with Planning Scheme Policies PSP28 and PSP30
on Water Supply Headworks Contributions and Sewerage Headworks Contributions respectively and at
the rates applicable at the time of payment. An estimate only of the contribution rates under the current
policies is outlined below. These amounts will adjusted in line with changes to the Consumer Price Index,
All Groups Brisbane from December 2005 until the date of payment.
Water Supply $10,059
Sewerage $27,965
TOTAL $38,024
All headworks contributions must be paid prior to the issue of a Development Permit for Operational
Works.
Alternatively a trading bank guarantee shall be submitted to Council plus 20%. Should the headworks
contributions not be paid at the due time, Council shall call upon the trading bank guarantee in full.
In the event that the Development Permit for Material Change of Use of Premises lapses or is cancelled,
the contribution or trading bank guarantee will be returned.
Site Stability
85. A Geotechnical Engineer or similar qualified expert shall assess the soil condition on site, determine the
soil classification, establish whether any measures are required to protect the stability of adjoining
buildings and/or structures, and make recommendations on the type of foundation system (including
retaining wall structures) best suited for the proposed development. This information shall be submitted to
the Council for assessment and approval prior to obtaining a Development Permit for Operational Works.
Earthworks
86. A Geotechnical engineer must be on site to supervise and direct all excavation works, and foundation
constructions (i.e. Level 1 supervision in accordance with AS3798-1996). Such work shall only be carried
out during dry weather conditions. Should any risk of soil movement occur - all work shall be suspended
until steps (approved by the Geotechnical engineer in conjunction with Council’s Manager of Building
Services) have been taken to ensure that no further slippage will result.
A c:\docume~1\tblogg\locals~1\temp\bcl technologies\easypdf 5\@bcl@6c06e85a\@[email protected]
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
05/1917 - SUPERSEDED Compiled Decision Notice [As Published]Related documentApplication case desk ↗
05/1917 - SUPERSEDED Compiled Decision Notice [As Published]Related documentApplication case desk ↗
05/1917 - SUPERSEDED Compiled Decision Notice [As Published]Related documentApplication case desk ↗
About this file
- File size
- 339 KB (small file)
- File type
No other editions are linked here.