Report #S7186, Lot 10 (MCH 5387), Tropicana Rise, Castaways Beach QLD 4567
28 August 2013




loads of at least 75kPa. For minor fill areas (less than 1.0 metres), the batters should be prepared to a
maximum grade of 1:2 (V:H) and vegetated immediately to reduce the opportunity for scour.

        6.3.3       Retention
All cut embankments exceeding 1.0 metre in height should be retained and engineer designed. Rigid or
flexible retention methods can be employed. Unretained cut embankments should not grade at less than
1:2 (V:H).

        6.3.4       Approved Fill
Where onsite or imported material is used as structural fill, it must comply with material requirements of
AS 3798 - 2007 “Guidelines on Earthworks for Commercial and Residential Developments”.


Unsuitable material must be removed beneath building and pavement areas. Unsuitable material include
organic soils, uncontrolled fills and building rubble (i.e. bricks, concrete, steel, household waste).

        6.3.5       Compaction
The in situ fine grained SAND must be compacted to achieve a minimum dry density ratio of 92% MMDD
while imported approved fill must be compacted to a dry density ratio of 95% MMDD in accordance with
AS1289.5.2.1. Compaction testing must be done using a nuclear density gauge in accordance with
AS1289.5.8.1.

Fill must be placed in horizontal layers not greater than 300 mm loose thickness. Each layer must be
compacted by suitable compaction equipment and carefully controlled to ensure even compaction over the
full area and depth of each layer.

Care will need to be taken while compacting in the vicinity of existing structures and retaining walls. This
is particularly important if vibratory compaction is being carried out. Tynan (1973) provides assistance
with the selection of compaction equipment for use adjacent to structures.


 6.4       Drainage

Drainage over the building area and near surrounds is very good, and is towards the east. Water is not to
pond in or around footings during or after construction. Further, the proposed floor level is not to be less
than 225mm above the finished ground level, or as required by the relevant Local Authority.

Stormwater will be required be contained over Lot 10. Stormwater drainage design should result in a non-
worsening discharge to surrounding allotments. Reference should be made to the Domestic Rainwater
Harvesting in Queensland (BSA 2011) and the Rainwater Tank Design and Installation Handbook
(MPMSAA 2008) documents.




GeoConsulting Pty Ltd
1/8 Denna St, Maroochydore, QLD, 4558. Phone: 5443 6622, Fax: 5479 1899, Email: [email protected]   11 | P a g e

Used in these records

About this file

File size
2.7 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

REFERENCED DOCUMENT - MCU13_0146.pdf · 2.7 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.