Traffic Engineering Report
Attached to the e-mail MCU16/0066 & OPW16/0133 Traffic Reports (3 of 4).
Original PDF page 9, section 1. The text section number identifies this passage in the reader.
3. Existing Transport Infrastructure
3.1. The Road Network
The majority of roads in the immediate vicinity of the site are administered by NSC, the
exception being the Bruce Highway which is a state controlled road. The hierarchy and
characteristics of roads in the immediate vicinity of the site are shown below in Table 3.1.
Table 3.1: Local Road Hierarchy
Road Speed Lanes Classification Road
Limit Authority
Taylor Court 50kph 2 (undivided) Local Road (industrial) NSC
Holts Road 60kph 2 (undivided, plus shoulder) Collector (industrial/rural) NSC
Myall Street 60kph 2 (undivided) Distributor (Urban) NSC
Bruce Hwy 70kph* 2 (partially divided, plus shoulder)* Highway DTMR
* See Section 3.2.
The Taylor Court carriageway is approximately 12m wide at the site frontage. The Holts Road
carriageway is approximately 11m wide at the site frontage with line marked 2m wide
shoulders and an impact barrier on the north/east side.
The Holts Road/Taylor Court intersection is priority controlled with give way signage and line
marking on the Taylor Court approach. Holts Road is widened in this location to provide a 3.5m
wide passing opportunity i.e. a basic right (BAR) turn treatment. The widening, excluding
tapers, is approximately 60m long which is consistent with Austroads design guidance for a
BAR treatment in a rural setting.
3.2. Transport and Land Use Planning
The existing Bruce Highway alignment and design is being upgraded as part of Bruce Highway
(Cooroy to Curra) Section A. The project is currently being delivered with works expected to be
completed in late 2016. The Cooroy interchange is impacted by these works and traffic
management measures are in place to divert traffic around construction sites. As this upgrade
will be completed before the proposed development could be operational, this assessment
only considers the layout of the interchange, including Myall Street, as it will be on opening
day.
On the opening day of the proposed development, the Bruce Highway will form a 4 lane
divided motorway with a posted 110kph speed limit. DTMR have provided plans of the
interchange which were prepared by GHD in 2014. The Myall Street/Holts Road intersection
will be formed as a priority controlled T intersection with the following features:
Two lane divided approach;
80m long right turn lane into Holts Road;
65m long left turn high angle slip lane with give way line marking into Holts Road; and
Site: Lot 3 Taylor Court, Cooroy 8
Reference: 16BRT0201
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.