OPERATIONAL PLAN 2024-25 Q3 QUARTERLY REPORTING (Referred from Services and Organisation Committee Meeting dated 10 June 2025 - Item 8.1) · Attachment 1 - Q3 Operational Plan Update
Plans and drawings: the text below has words only, no drawings.
Initiatives on Target
OP Ref Initiative Service/Mgr Responsible Status Reason for Status
2.4.5 Embed the Go Noosa program including the free Infrastructure Planning On Track The Go Noosa Christmas and Easter period has concluded, and
weekend and holiday bus program, as part of the Design & Delivery a review of the initiatives is now underway. An interim review
Transport Strategy to reduce traffic congestion Manager of the Go Noosa program was presented to Council recently in
and reduce emissions. light of the ongoing 50c fares and led to Council endorsing a
reprofiling of the free bus program to focus on the Loop Service.
The full evaluation of the Go Noosa program is scheduled to be
presented to Council meetings in July.
2.4.6 Undertake investigations into the Noosa Woods Infrastructure Planning On Track Consultant has been appointed to lead the investigation and
Jetty as potential ferry stop location as a means of Design & Delivery targeted stakeholder engagement has occurred to inform
public transportation, and to provide increased Manager consultants initial findings. A workshop is planned with
access to Noosa Woods. Councillors in the near future to share findings and establish
directions for the investigations.
2.5.1 Complete a new Noosa Libraries Business Plan to Arts and Culture Manager On Track First draft of Libraries Business Plan under review. Due for
ensure the delivery of a well-planned service that completion Q4 FY24/25.
meets community needs.
2.5.2 Continue to undertake the staged implementation Sport and Active Lifestyle On Track Ongoing with projects such as ND Netball clubhouse
of Master Plans for the Cooroy and Noosa District Manager redevelopment underway, CDSC has several projects currently
Sports Complexes to improve sport and recreation in planning and development stage
facilities and increase participation in sports.
2.5.4 Commence the design process for an Accessible Infrastructure Planning On Track Design Brief and amenities siting completed. Consultant
Adult Change Facility as part of the Noosaville Design & Delivery working towards a Concept Design for further Council review in
Foreshore Management Plan. Manager the near future following final consideration of the Noosaville
Foreshore Infrastructure Master Plan.
2.5.6 Provide inclusiveness coaching support to Sport and Active Lifestyle On Track Council's Inclusion Coach continues to implement and deliver
community groups to increase community Manager the Sport4All program across the shire working with schools and
participation for people with disabilities. clubs
2.7.2 Complete a needs assessment for the Noosa Sport and Active Lifestyle On Track NLC Needs Assessment completed and NAC project at latter
Leisure Centre and Noosa Aquatic Centre to Manager stages of delivery
provide a basis on which the sporting needs of the
community are determined.
2.8.2 Undertake a proactive auditing programme of Building and Plumbing On Track Kin Kin Audit program completed. Branch to move onto stage 2
wastewater treatment systems to keep Manager Cootharaba Audit, which is currently being planned. Letter drop
community safe and maintain water quality and to residents being prepared.
the health of waterways.