ITEM NO.                                               DESCRIPTION                                                      UNIT QUANTITY              RATE            TOTAL
                                                  SECTION 3 : ROADWORKS

    3.1        Provision for Traffic                                                                                    Item          1          1,780.00      $    1,780.00

    3.2        Roll, grade and trim subgrade                                                                             m2         1178           2.95        $    3,475.10

    3.3        Paving material complete including compaction (Compacted Volume)
               (a) Base Course - Class 2.1                                                                               m3          51           191.80       $    9,839.34
               (b) Sub-base Course - Class 2.4                                                                           m3          177          159.90      $ 28,254.33

    3.4        Concrete pavement as specified, complete including supply, broom, jointing,
               reinforcement, lay, compaction and testing.
               (a) 150mm Thick, N32, SL82 Mesh                                                                           m2          761          233.80       $ 177,921.80

    3.5        Supply and lay concrete kerb and kerb and channel including compaction of
               foundation, trim bedding gravel, complete .
               (a) Layback kerb & channel B1                                                                             m           38           98.10        $    3,727.80
               (b) Barrier kerb B2                                                                                       m           205          78.50       $ 16,081.12
               (c) Edge Restraint ER2                                                                                    m           24           88.30        $    2,119.20
               (c) 900 Wide Channel                                                                                      m           27           175.50       $    4,738.50

    3.6        Concrete pathway, complete in accordance with design drawings
               (a) 100mm Thick, N32, SL72 Mesh                                                                           m2          982          187.10       $ 183,732.20

    3.7        Supply and install rock scour protection to causeway crossings in accordance with
               design drawings complete                                                                                  m2          72           112.30       $    8,085.60


    3.8        Adjustment to services as required                                                                      Lump
                                                                                                                                                              $ 25,000.00
                                                                                                                        Sum


    3.9        Supply and install Kerb Ramp complete in accordance with design drawings                                  No.          2          1,186.00      $    2,372.00

    3.9        Supply and install precast concrete wheel stops                                                           No.         14           52.20        $      730.80

   3.10        Supply and install PWD Bollard complete in accordance with design drawings                                No.          1           224.40       $      224.40

   3.11        Supply and install pavement marking for car park an roads in accordance with the                        Lump
               design drawings                                                                                                                                $ 12,000.00
                                                                                                                        Sum



                                                       TOTAL SECTION 3
                                                                                                                                                               $ 480,082.19
                                                         ROADWORKS

QUANTITIES ILLUSTRATED HEREIN ARE ESTIMATES FOR TENDERERS INFORMATION ONLY. TENDERERS ARE REMINDED THAT THIS IS A LUMP SUM CONTRACT AND ALL QUANTITIES MUST BE CONFIRMED BY THE
                                                                     TENDERER IN THEIR TENDER SUBMISSION.




                                                                                  Page 4 of 6                         STP24-0253 Estimate of Costs-Site Civil Works-Rev A.xls

Used in these records

About this file

File size
122 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Bill of Quantities.pdf · 122 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.