Skip to the record
For the highest quality transcripts.

Original source · versioned page text

SARA RFI - Ecological Assessment Report

of 435

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file (67.6 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Original PDF page 180, section 1. The text section number identifies this passage in the reader.

ROLES AND RESPONSIBILITIES OF PERSONNEL INVOLVED IN ECOLOGICAL MANAGEMENT                                            1-7
         Element                        Description
         Responsibility                 •    Nominated responsible person(s) for undertaking each specific
                                             task/action.
         Performance                    •    The required level of performance, where environmental/ legislative
         Requirement                         standards apply, or in their absence, project specific performance
                                             objectives.
         Monitoring                     •    Procedures to monitor, measure and record performance.
         Reporting                      •    Reporting requirements of the task/action and the responsible parties.
         Corrective Action              •    The procedures to be undertaken if performance goals are not met.

1.4     Contract Agreement and Responsible Personnel

        The Developer will ensure that contractual documents with the Contractor for the implementation of
        the Ecological Restoration Plan (ERP) specifically quote the EMP as a responsibility. The
        contractual documents should also indicate that the ERP Contractor is responsible for ensuring EMP
        compliance. It should be noted that the ‘Duty of Care’ will apply to all personnel working in the ERP
        area.

        This EMP will be attached to all tender documents provided to any tenderers and compliance with the
        EMP will be a condition of contract.

        It should be noted that the Principal Contractor for the construction of the RHD and RSL areas will
        be required to appoint a Site Environmental Officer (SEO). It is expected that the ERP Contractor
        will regularly liaise (at least on a weekly basis) with the Restoration Ecologist. The ERP Contractor
        should also liaise regularly with the SEO to ensure the work programs are compatible with common
        objectives in relation to environmental management.

        In terms of responsibilities, the Project Manager appointed by Settlers Cove Development will be
        responsible for overseeing the implementation of EMP 3 including liaison with Council. The ERP
        contractor will be responsible for on-site implementation and compliance by other subcontractors and
        employees with the EMP. Settlers Cove Development Pty Ltd will appoint the Restoration Ecologist
        responsible for monitoring and assessing on-going compliance with the provisions of the ERP. The
        Restoration Ecologist is expected to be also responsible for the implementation of EMP3 in addition
        to implementation issues identified for the RHD and RSL developments as specified in EMP 1 and 2.
        The Restoration Ecologist position involves the co-ordination of a number of supplementary positions
        including a wildlife spotter/catcher, plant ecologist, arborist/arboriculturalist, as well as the
        Ecological Restoration Plan contractor.

        The Restoration Ecologist will liaise regularly with the Wildlife Ecologist as defined in EMP’s 1 and
        2.Roles and responsibilities and required qualifications and experience for these positions have been
        defined in Appendix A and are further clarified in relation to the Settlers Cove development in the
        Ecological Restoration Plan.




        S:\PROJECT MANAGEMENT\4.0 OVERALL DEVELOPMENT SITE\MANAGEMENT PLANS\EMP 3 (WBM OCEANICS).DOC 8/10/07 14:10
Log in to download the original file

SARA RFI - Ecological Assessment Report.pdf · 67.6 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.