Skip to the record
Beware of cheap imitations.

Original source · versioned page text

SARA RFI - Ecological Assessment Report

of 435

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file (67.6 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Original PDF page 193, section 1. The text section number identifies this passage in the reader.

ROLES AND RESPONSIBILITIES OF PERSONNEL INVOLVED IN ECOLOGICAL MANAGEMENT                                              4-5

        Element 4:                       ERP         Site        Materials             Handling              and     Waste
        Management


         Policy:       To manage waste in accordance with the waste management hierarchy outlined in the
                       Environmental Protection (Waste Management) Policy 2000:
                                • waste avoidance

                                • waste re-use

                                • waste recycling

                                • energy recovery from waste

                                • waste disposal.
                       To dispose of cleared vegetation appropriately. To handle and store any chemicals and
                       any other potentially hazardous materials including fuels and oils in a manner that
                       minimises risk.
                       (refer Condition 21.3, EP Act and EPP for waste, NSC waste policy)




        Strategy:        Ensure the appropriate handling, storage and disposal of materials including
                         solid and liquid waste.


        Responsibility: ERP Contractor and Restoration Ecologist
        Management Actions:

        1. Materials are to be located within the site area and not placed in a position subject to
           concentrated stormwater runoff that may result in materials being washed onto the roadway or
           into the stormwater system or protected habitat areas.

        2. All construction sheds, skip bins, temporary water toilets, spoil, etc., shall be kept within the
           property. No vehicles, skips or machines shall be permitted to stand on Council’s footpath.

        3. Establish and maintain a hazardous substance register to be kept on-site, including Material
           Safety Data Sheets. Register is to include herbicides, insecticides, fungicides, fertilisers.
        4. Where practicable, minimise the amount of fuel and oils stored on-site. Brushcutter and other
           equipment refuelling should be carried out in location where any spillage can be effectively
           contained and disposed of. Such areas will be determined by ERP Contractor and the Restoration
           Ecologist.
        5. Any fuel and oils stored on-site to be contained by watertight bunds or spill trays with adequate
           capacity to prevent release to environment in the case of leaks or accidental spillage.




        S:\PROJECT MANAGEMENT\4.0 OVERALL DEVELOPMENT SITE\MANAGEMENT PLANS\EMP 3 (WBM OCEANICS).DOC 8/10/07 14:10
Log in to download the original file

SARA RFI - Ecological Assessment Report.pdf · 67.6 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.