Skip to the record
The gold standard in government transparency.

Original source · versioned page text

SARA RFI - Ecological Assessment Report

of 435

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file (67.6 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Original PDF page 196, section 1. The text section number identifies this passage in the reader.

ROLES AND RESPONSIBILITIES OF PERSONNEL INVOLVED IN ECOLOGICAL MANAGEMENT                                            4-8
        Element 6 – Erosion and Sediment Control


         Policy:       To prevent erosion of areas to be disturbed as part of ERP implementation and the
                       transport of sediment and soil to outside construction area. To prevent or minimise the
                       risk of detrimental impacts on receiving waters and aquatic ecosystems resulting from
                       discharge of water from site during program. (refer Conditions 14.1, 78-90; Council
                       Policy, EP Act)




         Strategy:          To ensure that erosion and sedimentation is adequately controlled during the
                            ERP implementation.
         Responsibility: ERP Contractor (in Liaison with Restoration Ecologist). Surface water monitoring
         to be undertaken by specialist consultant appointed by the developer.
         Management Actions:

         1. The general principles of the Erosion and Sediment Control (E and SC) Plan are to ensure that:
              •    All activities occur within approved disturbance areas as addressed with Wildlife Ecologist
                   and Restoration Ecologist.
              •    All disturbed areas with exposed soil are to be temporarily stabilised by mulching with
                   material produced from native vegetation derived from the adjacent construction site.
              •    Exposed soil areas are to be revegetated as soon as practicable after clearing/ disturbance.
              •    All revegetation shall be carried out in accordance with the ERP.
              •    No clearing of vegetation, ground disturbance and associated earthworks activities.
                   resulting in exposed soil areas in excess of 600m2 are to be undertaken without an erosion
                   and sediment control plan being available for such works.
              •    Clean stormwater is to be diverted around bare soil areas of the site including any stockpile
                   runoff. Any sediment control measures are to avoid significant trees and retained
                   vegetation.
              •    Installation of controls on the upstream and downstream side of any stockpiles or fill
                   embankments.
              •    Removal and appropriate disposal of deposited material, litter and gross pollutants.
         Inspections of erosion and deposition to be conducted on a weekly basis and following storm events
         that have the potential to cause erosion ie. normally events with a rainfall intensity greater than
         25mm/hr or greater than 50mm each day. Water quality monitoring locations within the ERP area
         (see Appendix C) are to be identified and protected from any disturbance that may affect monitoring
         results (locations and management to be addressed in liaison with the Wildlife Ecologist).
         Erosion and sediment control measures will be implemented in areas prior to commencement of any
         ground disturbance activities. This includes:
              •    Designating areas for machinery and material storage (as required) away from drainage
                   paths (see Element 1);
        S:\PROJECT MANAGEMENT\4.0 OVERALL DEVELOPMENT SITE\MANAGEMENT PLANS\EMP 3 (WBM OCEANICS).DOC 8/10/07 14:10
Log in to download the original file

SARA RFI - Ecological Assessment Report.pdf · 67.6 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.