Potential sources of contaminants identified for the construction phase of the development are
outlined in Table 6.2 together with proposed stormwater quality improvement devices,
management and maintenance procedures.
Table 6.2 - Potential Contaminants and Proposed Treatments
Management / Proposed Treatment Device
Pollutant Potential Source
Maintenance Procedures and Maintenance Procedure
Sediment & Excavated Provision of sediment and Sand filled filter socks.
Eroded material, fill silt barriers to the site Removal of excess sand/silt
material material, exposed drainage entry and exit build-up at regular
ground, stockpiles points. intervals and after every
of material. storm.
Dust Stockpiles of Covering the material or Coverage of material with
material, exposed wetting it down at regular plastic, geotextile, surface
ground. intervals. binding agents or regular
watering.
Litter Refuse generated Construction waste is to Industrial bin is to be
by staff. be cleaned off the site provided within the
area and disposed of into construction area - to be
an industrial bin then emptied on at least a
removed by a refuse weekly basis.
collection contractor.
Concrete Washing of Provision of a closed area Liquids to be removed by a
concrete onsite for washing off of waste collection
trucks/tools to concrete slurries. contractor. Solids to be
remove placed into a refuse bin.
wet/unused
concrete.
Surfactants Washing down No cleaning of vehicles Monitoring & prevention
(detergents) operations on will be permitted on site.
hardstand area
using detergents.
Chemical Typically this may Where spills occur, the A temporary containment
(Paints, occur due to containment area is to area. This is to be
thinners spillage of product. stop escape. The material impermeable and of a size
etc.) is to be treated (as to permit mixing/transfer,
required) and removed and with a storage volume
and cleaned by a licensed of twice the largest
contractor. container used.
Minor spillage outside this Treatment of spills is to
area shall be cleaned up occur on site. No discharge
with cloths and disposed of treated water to the
of to waste via the stormwater system is to
industrial bin. occur without council
approval. Incidents are to
be reported to the EPA.
Wastewater Spillage from the A licensed contractor shall No leakage is to be
relocation of the remove any residue permitted to enter the
existing sewerage sewage from unused pipes groundwater or discharge
reticulation. and contaminated soils are to the stormwater system.
to be disposed of via the
industrial bin.
Site Based Stormwater Management Plan
Reconfiguration of a Lot and Mixed Use Development at 215 David Low Way, Peregian Beach
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.