6.3 Operational Phase
Water quality objectives (WQO’s) for South East Queensland as set out in State Planning Policy
2017 (SPP 2017) should be achieved by identifying and adopting best practise techniques in
accordance with the abovementioned guidelines. Refer to Table 6.3 for the target WQO’s.
Table 6.3 – Minimum Mean Annual Load Reductions
Minimum Mean Annual
Contaminant
Load Reductions
Total Suspended Solids (TSS) ≥ 80%
Total Phosphorus (TP) ≥ 60%
Total Nitrogen (TN) ≥ 45%
Gross Pollutants (GP) ≥ 90%
Additionally, in order to satisfy Council’s condition no. 22(c) under application no. MCU16/0153
REC16/0041, the annual loads for the abovementioned contaminants from the post developed site
must be less than the annual loads from the pre developed site.
6.3.1 Sources of Contaminants
Potential sources of contaminants and stormwater quality improvement devices identified for the
operational phase of the development are outlined in Table 6.4.
Table 6.4 - Sources of Contaminants
Pollutant
Target Pollutant Type Acceptable Treatment Examples
Size
Primary Screening of gross Litter baskets, swales, buffer strips,
>5000um
Pollutants pollutants GPT’s, Bio-retention basins
Sedimentation of
Secondary 125um -
coarse to medium Swales, sedimentation basins, ponds
Pollutants 5000um
sediment
Bio-retention basins, constructed
Enhanced
10um – wetland macrophyte zones, other bio
sedimentation of fine
125um technologies, proprietary tertiary
particulates
stormwater treatment dvices
Tertiary Adhesion and filtration Constructed wetland macrophyte zones,
0.45um –
Pollutants of very fine / colloidal other bio technologies, proprietary
10um
sediment tertiary stormwater treatment dvices
Biological uptake of Constructed wetland macrophyte zones,
<0.45um
dissolved particles other bio technologies
6.3.2 Proposed Treatment Train
The proposed treatment train has been modelled using the following methodology:
1. Roofwater runoff from each proposed residential dwelling will be collected a 3kL water
reuse tank with overflow to the internal drainage network and directed to the proposed
bio-retention basin for treatment.
Site Based Stormwater Management Plan
Reconfiguration of a Lot and Mixed Use Development at 215 David Low Way, Peregian Beach
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.