                              Table 6.6 – Catchment Runoff Generation Parameters

                                  Parameter                         Residential Catchment


                              Rainfall Threshold                               1

                          Soil Storage Capacity (mm)                          500

                     Initial Storage Capacity (% capacity)                    10

                             Field Capacity (mm)                              200

                      Infiltration Capacity Coefficient a                     211

                      Infiltration Capacity Coefficient b                      5

                              Initial Depth (mm)                              50

                           Daily Recharge Rate (%)                            28

                           Daily Baseflow Rate (%)                            27

                         Daily Deep Seepage Rate (%)                           0


6.3.5 MUSIC Modelling Results
Refer to Figure 6.1 for a print screen schematic of the pre development MUSIC model and the
annual pollutant loads that will be discharged from the proposed development site. Refer to Figure
6.2 for a print screen schematic of the post development MUSIC model and the annual pollutant
loads that will be discharged from the proposed development site.




        Figure 6.1 - MUSIC Model Print Screen Schematic and Results for Pre Development.


Site Based Stormwater Management Plan
Reconfiguration of a Lot and Mixed Use Development at 215 David Low Way, Peregian Beach
Log in to download the original file

18164 - SBSMP - Rev 0.pdf · 8.3 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.