18164 - SBSMP - Rev 0
Attached to the e-mail Operation Works Application - OPW19/0266 - 215 David Low Way, Peregian Beach - (EMAIL 2/3) - Site Based Stormwater Management Plan, Acid Sulphate Soil & Groundwater Management Plan.
18164 - SBSMP/0
Page 13
Table 6.6 – Catchment Runoff Generation Parameters
Parameter Residential Catchment
Rainfall Threshold 1
Soil Storage Capacity (mm) 500
Initial Storage Capacity (% capacity) 10
Field Capacity (mm) 200
Infiltration Capacity Coefficient a 211
Infiltration Capacity Coefficient b 5
Initial Depth (mm) 50
Daily Recharge Rate (%) 28
Daily Baseflow Rate (%) 27
Daily Deep Seepage Rate (%) 0
6.3.5 MUSIC Modelling Results
Refer to Figure 6.1 for a print screen schematic of the pre development MUSIC model and the
annual pollutant loads that will be discharged from the proposed development site. Refer to Figure
6.2 for a print screen schematic of the post development MUSIC model and the annual pollutant
loads that will be discharged from the proposed development site.
Figure 6.1 - MUSIC Model Print Screen Schematic and Results for Pre Development.
Site Based Stormwater Management Plan
Reconfiguration of a Lot and Mixed Use Development at 215 David Low Way, Peregian Beach
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.