18164 - SBSMP - Rev 0
Attached to the e-mail Operation Works Application - OPW19/0266 - 215 David Low Way, Peregian Beach - (EMAIL 2/3) - Site Based Stormwater Management Plan, Acid Sulphate Soil & Groundwater Management Plan.
18164 - SBSMP/0
Page 14
Figure 6.2 - MUSIC Model Print Screen Schematic and Results for Post Development.
The modelling results show that the pollutant reduction objectives are met for all contaminants
given in Section 6, including a reduction less than pre development loads. Therefore, it is confirmed
that post development annual loads will be less than pre development annual loads.
Should operational requirements change, this plan is required to be amended to suit. Substantial
changes may require resubmission to the local authority. Following completion of construction,
this plan is to be incorporated into the total-site management practices.
Site Based Stormwater Management Plan
Reconfiguration of a Lot and Mixed Use Development at 215 David Low Way, Peregian Beach
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.