Skip to the record
Every meeting, every word.

Original source · versioned page text

2017-11-07 Services & Organisation Committee Agenda

of 135

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (19.1 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                   7 NOVEMBER 2017


BRANCH ACTIVITIES                    RECENT ACHIEVEMENTS                          CURRENT PRIORITIES                           THE NEXT QUARTER
Development and finalisation of         EOI for 4 Jarrah Street, Cooroy -          Continuing to align Certificates of        Initiate lease negotiations for
commercial tenure documents.              About to undertake lease                     Currency for Public Liability to             Sunrise Shop 8 – supermarket
                                          negotiations with successful                 financial year.                              (market valuation has been
                                          applicant.                                 Renew co-location lease agreement            obtained).
                                        EOI Lot 5 Lower Mill site, Cooroy            for sub tower at the Noosaville            Report to Council for lease option for
                                          process finalised, permit issued,            depot.                                       Sunrise Shop 3 – Hairdresser.
                                          markets have commenced.                    Cooroy RV Stopover – EOI
                                        Commercial High Use permit - Beach           assessment process to be
                                          Massage decided.                             undertaken.
                                        Cooroy RV Stopover – EOI process
                                          closed.
Noosa River Foreshore Land Use          Options/findings report discussed          Draft plan currently being finalised.    Draft plan to be formally agreed by
Master Plan.                              with Council.                                                                           Council.
North Shore Campground conceptual       Development assessment approval         Working with Council’s Project Officer to:   Working with Council’s Project Officer to:
planning & feasibility assessment.        for material change of use complete.     Seek ‘Early Works’ approval from           Procure consultant and commence
                                        Land Care remediation of site at           DNRM for 2018 construction                   water/wastewater design.
                                          northern end.                              program (in lieu of Ministerial signoff    Receive and approve preliminary
                                                                                     on land-swap).                               designs and indicative costings for
                                                                                   Complete hydrogeological study on            campground from landscape
                                                                                     groundwater aquifer to inform                architecture team.
                                                                                     water/wastewater design.                   Implement updated comms plan on
                                                                                   Receive and approve concept                  proposed construction in 2018.
                                                                                     designs for campground from                Procure and commence next stage
                                                                                     landscape architecture team.                 of site vegetation.
Business as Usual activities            Rufous Street Digital Hub PCG              Quarterly performance plan reviews         Implementation of service review
                                          meetings.                                    for all staff.                               recommendations.
                                        Performance plans developed for all        Development of permit and reporting        Ongoing assessment of applications
                                          staff.                                       template for Sunshine Coast Sports           and permits for use of Council
                                        Various High Use Permit and                  Aviators Inc. Tingira Crescent as a          owned or managed land.
                                          Temporary Event applications                 launch site for Hang gliding /             Quarterly performance plan reviews
                                          decided.                                     paragliding.                                 for all staff.
                                        Workplace Health and Safety                Finalising land tenure issues with         Finalising service plan for Lifeguard
                                          Inspections completed for all Holiday        DNRM for Cooroy RSL to enable the            Services for Council consideration.
                                          Parks.                                       issue of a trustee lease.                  Lifeguard Facility Workplace Health
                                        Cash audit undertaken on Ferry             Noosa Heads SLSC – further                   and Safety Inspections to be
                                          Services.                                    discussions re club plans to relocate        undertaken in November.
                                        Workplace Health and Safety audit            Peregian lifesaving building
                                          completed on ferry

                                                                                         Page 94 of 135
Log in to download the original file

2017-11-07 Services & Organisation Committee Agenda(PDF, 18MB).pdf · 19.1 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.