Original source · versioned page text
2019-06-05 Special Meeting Minutes
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
SPECIAL MEETING MINUTES 5 JUNE 2019
40.1. The Fauna Management Plan must address and demonstrate compliance with
the requirements of Schedule 11 Part 2 Section 7 of the Planning Regulation
2017.
40.2. Identify all koala habitat trees on plan
Landscaping Works
41. The development site must be landscaped in accordance with a Council endorsed
landscape package prepared by a qualified person*. The works must be undertaken in
accordance with an Operational Works approval, Planning Scheme Policy 3
Landscape Plants and Guidelines and must include in particular:
41.1. Clear integration of the Bushfire requirements for the site, including landscaping
treatment to the western 20m building setback area using low threat vegetation.
41.2. Landscaping adjacent to the northern boundary of the subject land within the
Rufus Street reserve and Rufous laneway to provide a visual buffer to the
development.
41.3. 3m wide landscaping in the northern building setback area from Rufous Street
and Rufous Lane to the dwelling units such landscaping to comprise a
combination of lawn and vegetation to facilitate a usable “backyard” space.
41.4. Landscaping to the Rufous Street pedestrian link between dwelling units 13 and
14.
41.5. Landscaping to the eastern boundary adjacent the adjoining hotel boundary
41.6. Landscaping to the Visitor accommodation Type 4 motel building and all other
Visitor accommodation Type 4 dwelling units.
41.7. Landscaping to the park areas in the north east and north west portions of the
site.
41.8. Details of water quality treatment device plantings.
41.9. Details of the landscaping treatment to the western portion of the site between
the road and the reserve.
41.10. Details of any fencing and gates, including acoustic fencing, the fencing to the
shopping centre and the Rufous Street and Rufous Lane and any fencing to the
western reserve.
41.11. Details of protection methods to be engaged to protect trees located on the
northern and southern boundaries.
41.12. the western boundary of the IGA supermarket development, within that
development site.
41.13. Native trees of a minimum bag size of 100L to replace existing trees to be
removed from the site, at the rate of 1 replacement tree for every tree removed
that has a diameter greater than 200mm measured at 1.2 metres from ground
surface level.
42. All landscape works must be established and maintained in accordance with the
approved design for the life of the development, and in a manner that ensures healthy,
sustained and vigorous plant growth. All plant material must be allowed to grow to full
form and be refurbished when its life expectancy is reached.
43. All landscape works must be maintained generally in accordance with the approved
design for the life of the development.
Bushfire
44. All works must be carried out in accordance with a Bushfire Management Plan
Page 10 of 16
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.