Original source · versioned page text
2019-06-05 Special Meeting Minutes
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
SPECIAL MEETING MINUTES 5 JUNE 2019
Damage to Services and Assets
32. Any damage caused to existing services and assets as a result of the development
works must be repaired at no cost to the asset owner at the following times:
a. where the damage would cause a hazard to pedestrian or vehicle safety,
immediately; or
b. where otherwise, upon completion of the works associated with the development.
Any repair work which proposes to alter the alignment or level of existing services and
assets must first be referred to the relevant service authority for approval.
Outdoor Lighting
33. Any outdoor lighting with the potential to affect surrounding residential premises shall
be designed, installed, operated and maintained in accordance with AS4282 “The
Control of the Obtrusive effects of Outdoor Lighting”.
Fencing and Walls
34. Any street fencing to David Low way or Sandpiper Court must be set back an average
of 1 metre from the front property boundary. Any fencing on the front boundary must
either:
a. not exceed a maximum height of 1.2m
b. be of open construction.
Street Identification
35. The street address of the development must be clearly visible and discernible from the
primary frontage of the site by the provision of a street number and, where appropriate,
the building name.
Clothes Drying Areas
36. Each dwelling unit in Stage 2 must be provided with access to an outdoor clothes line
which is screened from public view.
Performance Bond
37. Security in the form of a cash bond or trading bank guarantee to the sum of $50,000
for stage 1 and $50,000 for stage 2 must be submitted to Council, to secure
performance of all conditions of this approval, prior to the issue of a Development
Permit for Operational Works. The cash bond or trading bank guarantee will be
returned on performance of the conditions of approval less any costs incurred by
Council in respect of enforcing performance of this permit. Council reserves the right
to call upon the bond or guaranteed sum to effect compliance with conditions.
Community Management Statement
38. Any proposed Community Management Statement required for the development
pursuant to the Body Corporate and Community Management Act 1997 must be
submitted to Council for endorsement at the same time as submission of the Building
Format Plan (or similar) to Council for compliance assessment.
Sunset Clause for Completion of Approved Development
39. Pursuant to s88(1) of the Planning Act 2016, the aspects of this development approval
which have not been completed within 8 years of the date the development approval
takes effect, lapse.
Fauna Management
40. Vegetation must only be removed or disturbed in accordance with a Fauna
Management Plan (or part thereof) prepared by a qualified person* and endorsed
through an Operational Works approval and include the following items:
Page 9 of 16
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.