SPECIAL MEETING MINUTES 5 JUNE 2019
vi. corrective actions and contingency measures;
vii. reporting arrangements;
viii. auditing arrangements;
ix. how the requirements are to be incorporated into construction and works
contracts;
x. how the Developer’s employees, contractors and the contractor’s
employees will be informed and trained with respect to the environmental
protection requirements; and
xi. enforcement and penalties for non-compliance.
48.4. In particular, but without limitation, the EMP shall address the following issues in
relation to the construction phase:
i. legislative compliance;
ii. soil erosion and sediment control;
iii. vegetation protection;
iv. fauna and fauna habitat protection;
v. weed and pest control;
vi. water quality protection;
vii. ground water protection;
viii. air quality protection;
ix. storage and handling of hazardous substances;
x. noise and vibration management;
xi. waste management;
xii. cultural heritage management;
xiii. visual amenity protection;
48.5. In particular, but without limitation, the EMP shall address the following issues in
relation to the operational phase:
i. legislative compliance;
ii. water conservation;
iii. water quality protection;
iv. maintenance of Stormwater Quality Improvement Devices
v. vegetation protection;
vi. fauna protection;
vii. bushfire control;
viii. weed and pest control;
ix. biting insects management
x. waste management.
49. The EMP shall be submitted to Council prior to or in conjunction with the lodgement of
any development applications for Operational Works for the Site. Operational Works
approval shall not be granted until the EMP is approved by the Manager Development
Assessment. The Developer shall comply with the requirements of the EMP.
Building Demolition/Removal/Relocation
50. Where the development involves the removal, relocation or demolition of a building, a
Waste Management Plan (construction and demolition) shall be submitted and
approved by Council’s Environmental Health Officer prior to issue of a development
permit for operational works for demolition, removal or relocation of any building other
than a shed.
Page 12 of 16
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.