SPECIAL MEETING MINUTES 5 JUNE 2019
The purpose of the Waste Management Plan is to facilitate the segregation of waste
for the effective reuse and recycling of such materials. Segregated wastes attract
significantly reduced disposal fees at the landfill with some items free. Higher gate
fees are charged for mixed waste.
Waste Management Plans (construction and demolition) are required to be submitted
in accordance with Planning Scheme Policy 11, Waste Management Plans.
Waste storage areas are to provide for adequate separation of all reusable, recyclable
and waste materials. These shall be located so that they are convenient and safe to
use.
The Plan shall contain the following information:
a. The site area for the storage and separation of waste is to be shown on the plan
drawings accompanying the application
b. A waste management table as indicated below is to be completed showing how
waste material is to be segregated - recycled – reused or disposed.
c. Table – Waste Management Table
MATERIALS ON-SITE DESTINATION
Re-use and Recycling Disposal
Expected Estimated On-site Off-site *specify
waste volume(m³) *specify proposed *specify contractor contractor and
materials re-use or on-site and recycling outlet landfill site or
recycling methods other disposal site
Excavation
material
Green waste
Bricks
Concrete
Timber-please
specify
Plasterboard
Metals -
please specify
Asbestos
Other - please
specify
Note * If a demolition contractor is undertaking works, then the Waste Management table is to
be completed by the demolition contractor.
Waste Storage
51. The developer must provide waste storage and disposal facilities in accordance with
Planning Scheme Policy 9, Waste Management, including an external imperviously
paved area correctly sized for all refuse and recycling containers and suitably screened
from public places and neighbouring properties.
52. A bin wash area is required with a cold-water tap, hose and drain outlet connected to
sewer, via a bucket trap. The drain outlet is to be designed to prevent storm water entry
to the sewerage system which can be achieved by a bunded area, with a nib wall height
of 100mm maximum, enclosing a wash area of 700mm x 700mm minimum (max
0.7m²). Alternatively, the waste area can be roofed, or any other appropriate design
approved by Council.
Noise
53. Upgraded building envelope constructions and the provision of mechanical
ventilation/air conditioning which achieves the ventilation requirements of the Building
Code of Australia, in accordance with the Second Joint Report of Experts in Noise (30
May 2018) for Planning and Environment Court Appeal 4066 of 2017, including:
Page 13 of 16