Skip to the record
For the highest quality transcripts.

Original source · versioned page text

220711 Noosa Oyster Project - CEMP

Attached to the e-mail Noosa Oyster Project _ Construction and Environmental Management Plan (CEMP).

of 50

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (13.4 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

          Where possible all existing building and                                 Ongoing during
                                                        Site Supervisor
          excavation materials will be re-used on site.                            project




       3.2.8. Noise

                                                                                   Timing /
          Control Measure                                Responsibility
                                                                                   Frequency
          Potential Impact: Unacceptable noise levels and vibrations
          Work equipment will be maintained in good
          working order to comply with EPA                                         Ongoing during
                                                    Site Supervisor
          guidelines. Where required, noise                                        project
          suppressors will be installed.
          Hearing protection will be worn eg                                       Ongoing during
                                                         All workers
          earplugs or earmuffs.                                                    project
          Work will take place during nominated                                    Ongoing during
                                                         Site Supervisor
          work hours only.                                                         project

       3.2.9. Heritage

                                                                                   Timing /
          Control Measure                                Responsibility
                                                                                   Frequency
          Potential Impact: Damage to heritage items
          All heritage items will be identified and                                Ongoing during
                                                         Site Supervisor
          fenced off prior to commencing works.                                    project
          All workers and visitors will be notified of                             Ongoing during
                                                         Site Supervisor
          any heritage items on site.                                              project
          No items will be stored or work undertaken                               Ongoing during
                                                     Site Supervisor
          within the boundary of a heritage item.                                  project
          If heritage items are found during the
          course of works, work will stop                                          Ongoing during
                                                         Project Manager
          immediately and the relevant authorities                                 project
          notified.




M&J Marine Services                            Page 16                     Environmental Management Plan
Log in to download the original file

220711 Noosa Oyster Project - CEMP.pdf · 13.4 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.