220711 Noosa Oyster Project - CEMP
Attached to the e-mail Noosa Oyster Project _ Construction and Environmental Management Plan (CEMP).
The original of this document is very large (13.4 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Pro
ject Site Subc
Work
TASK Ma Superv ontra
ers
nag isor ctors
er
Inducting workers and subcontractors and directing
2 1 2 2
site activities in accordance with the EMP.
Identifying, assessing and eliminating any non-
compliance or environmentally risky conditions and 1 1 2 2
documenting the risk controls implemented.
Promoting and maintaining good environmental
management in accordance with the relevant 1 1 2 2
environmental legislation, regulations and laws.
Implementing practical measures to ensure the site
2 1 2 2
complies with the EMP and project specifications
Maintaining, providing updates and supplying this
1 2 2 2
EMP to relevant authorities and workers.
Monitoring and assessing subcontractors for the
project to ensure environmental regulations are met 1 2 2 2
and relate to the works undertaken
Maintaining stocks for environmental control 1 1 2 1
Provide and maintain a hazardous substances register
for hazardous substances used and stored in the 1 1 2 2
workplace;
1 = has responsibility for the overall implementation and / or management of the process/procedure on the
project
2 = has responsibility for complying with the process/procedure on the project
M&J Marine Services Page 7 Environmental Management Plan
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.