Annex 13 - Schedule 3 - Prescribed Tidal Works
Attached to the e-mail DA Application - Noosa Oyster Project (2 of 3).
Coastal Protection and Management Regulation 2017
Schedule 3. Code for Assessable Development that is prescribed tidal works
Part 3 Performance outcomes and acceptable outcomes
be trafficable by pedestrians as this would
negatively impact on the habtitat.
(g) The design considers that the works will be
underwater at times and subject to
hydrostatic pressures, but given the nature of
the works this is not critical to the design.
(h) The stability of individual rocks has been
determined based on internationally
recognised world’s best practice guidelines.
Rock structure are inherently flexible and able
to accommodate some movement or
displacement of individual boulders, which
may occur during a design event. This is to
be addressed through maintenance if
required.
The oyster shell is not inherently stable in the design
site conditions, but shell stability has been optimised
by the use of whole shell, the mixing of shell with the
rocky substrate to secure it within the rocky matrix, the
placement of loose oyster cultch as a single layer by
hands into interstitial voids and the capping of the
volume of loose shell placed to 10kg/m3. Refer ICM
drawing NROR-2021-02 Notes 3 & 5 for placement
requirements. Where monitoring identifies displaced
shell that is more than 5m outside the Restoration Site,
it is to be removed in the event that it is resulting in
negative impacts. Refer ICM drawing NROR2021-00
Note 4.2 and Project Restoration Plan.
12.2 Prescribed tidal works do not adversely The design and construction of the prescribed tidal works is Complies with Performance Outcome 12.2.
affect the structural integrity of any existing consistent with the following standards—
revetment or seawall or another existing (a) subject to paragraph (b), prescribed tidal works, including The works allow for a minimum distance of at least
structure. any abutment, piling or other structure connected with the 30m from existing tidal works. As such, it is not
works— anticipated that the works will impact on any existing
(i) do not place an additional load on any existing revetment or structure.
seawall or another existing structure; or
11