Annex 13 - Schedule 3 - Prescribed Tidal Works
Attached to the e-mail DA Application - Noosa Oyster Project (2 of 3).
Coastal Protection and Management Regulation 2017
Schedule 3. Code for Assessable Development that is prescribed tidal works
Part 3 Performance outcomes and acceptable outcomes
(c) deterioration or breakage resulting from planning scheme standard, to the extent it is more stringent than The cured oyster shell was originally sourced from
exposure to environmental conditions the standard mentioned in paragraph (a). within the marine environment and is suitable for use
including, for example, the following— in the Noosa River subject to curing in accordance
(i) abrasion; with relevant legislation. For specifications, refer ICM
drawing NROR-2021-02 and Project Restoration Plan.
(ii) immersion in seawater;
(iii) wave action.
12.5 Prescribed tidal works are designed and The design and construction of the prescribed tidal works is Complies with Performance Outcome 12.5.
constructed in a way to ensure they do not consistent with the following standards—
adversely affect the operation or maintenance (a) subject to paragraph (c), vessels moored at prescribed tidal The works are seaward of MHWS and will not
of any existing stormwater outlet. works do not impede the discharge of stormwater; adversely affect the operation or maintenance of any
existing stormwater outlet.
(b) subject to paragraph (c), prescribed tidal works do not
restrict access to any stormwater outlet;
(c) if a relevant planning scheme standard is more stringent
than the standard mentioned in paragraph (a) or (b)—the
relevant planning scheme standard, to the extent it is more
stringent than the standard mentioned in paragraph (a) or (b).
12.6 Prescribed tidal works are designed and The design and construction of the prescribed tidal works is Complies with Performance Outcome 12.6 (subject to
constructed in a way to ensure they do not consistent with the following standards— monitoring)
adversely affect the water quality of tidal (a) subject to paragraph (b), each Australian Standard relevant
water, including, in particular, as a result of— to the design or construction of structures under, within or over As oysters are filter feeders, the works would be
(a) release, into the tidal water, of materials tidal water, to the extent the requirements stated in the Standard expected to result in improved water quality outcomes
used in the construction of the works; or are directed at maintaining the water quality of tidal water; for the Noosa River.
(b) disturbance to the sediment on the bed (b) if a relevant planning scheme standard is more stringent During construction, rock placement activities may
and banks of the tidal water; or than the standard mentioned in paragraph (a)—the relevant result in some suspension of sediment. Construction
planning scheme standard, to the extent it is more stringent than materials are to be clean and free of topsoil or organic
(c) exposure to acid sulphate soils. the standard mentioned in paragraph (a). material. Construction is to be managed to minimise
potential for impacts and monitoring of sensitive
receptors is to be undertaken. Detailed requirements
are outlined in ICM drawing NROR-2021-02 and
section 6.4 of the Project Restoration Plan.
a) Construction waste or excess materials are
not to be released into tidal waters.
13