Original source · versioned page text
Annex 13 - Schedule 3 - Prescribed Tidal Works
Attached to the e-mail DA Application - Noosa Oyster Project (2 of 3).
Coastal Protection and Management Regulation 2017
Schedule 3. Code for Assessable Development that is prescribed tidal works
Part 3 Performance outcomes and acceptable outcomes
b) Works do not include disturbance of sediment
on the seabed or banks. Incidental
disturbance as a result of rock placement is
to be minimised and monitored as described
above.
c) Works do not include disturbance or
exposure of sediment (Acid Sulphate Soils or
otherwise).
12.7 Prescribed tidal works are designed and The design and construction of the prescribed tidal works is Complies with Performance Outcome 12.7.
constructed in a way to ensure they are safe consistent with the following standards—
for persons using the works. (a) subject to paragraph (d), each Australian Standard relevant The works have been designed to be stable and well
to the design or construction of structures, the materials that interlocked with gaps between reef patches that are 1-
should be used, or the measures that should be taken to treat 4m wide at the seabed. The works are considered to
materials used, for structures, to the extent the requirements be generally safe for an aware person monitoring the
stated in the Standard are directed at ensuring any surface of works and/or carefully traversing between individual
prescribed tidal works on which a person may stand or walk is— modules. The modules themselves are not intended
(i) not slippery; and to be traversed and are designed to have uneven
surfaces with voids and loose oyster shell to provide a
(ii) does not have any feature that may cause the person to trip suitably complex habitat that has the potential to
or fall; provide a trip hazard. Over time, these surfaces are
intended to be inhabited by oysters and other species
(b) subject to paragraph (d), any part of prescribed tidal works
which could result in the rocks becoming both slippery
that is unsafe for persons using the works is surrounded by
and sharp. These risks are inherent with the natural
adequate barriers to deter persons from entering the part;
type of habitat being restored and while they have
(c) subject to paragraph (d), each Australian Standard relevant been minimised where possible they cannot be
to the design or construction of structures, to the extent the eliminated. Monitoring and maintenance is required
requirements stated in the Standard are directed at ensuring (particularly in the years after deployment). Refer to
prescribed tidal works provide safety ladders or other design the Safety in Design assessment for additional detail.
features for the safety of a person who falls off the works into
water;
(d) if a relevant planning scheme standard is more stringent
than the standard mentioned in paragraph (a), (b) or (c)—the
relevant planning scheme standard, to the extent it is more
stringent than the standard mentioned in paragraph (a), (b) or
(c).
14
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.