Original source · versioned page text
Annex 13 - Schedule 3 - Prescribed Tidal Works
Attached to the e-mail DA Application - Noosa Oyster Project (2 of 3).
Coastal Protection and Management Regulation 2017
Schedule 3. Code for Assessable Development that is prescribed tidal works
Part 3 Performance outcomes and acceptable outcomes
12.8 Appropriate measures are taken for The design and construction of the prescribed tidal works is Complies with Performance Outcome 12.8.
prescribed tidal works for a non-private consistent with the following standards—
purpose to ensure an unsupportable live load (a) subject to paragraph (b), prescribed tidal works have erected The works are to be marked by a buoy with signage
is not applied to the works by persons or or placed in position on or near the works, a sign that— indicating that the works are a restoration area.
vehicles. (i) is visible at all times; and Details are available in section 7 of the Project
Restoration Plan.
(ii) states the maximum live load that may be applied to the
works, in terms of the maximum number of persons that may be
on the works at any given time or the maximum number of
vehicles of a particular type that may be on or moored at the
works at any given time;
(b) if a relevant planning scheme standard is more stringent
than the standard mentioned in paragraph (a)—the relevant
planning scheme standard, to the extent it is more stringent than
the standard mentioned in paragraph (a).
12.9 Prescribed tidal works, other than a The design and construction of the prescribed tidal works is Not applicable.
prescribed deck for a private purpose, are consistent with each relevant planning scheme standard.
designed and constructed in a way to ensure Not in a canal.
the use of tidal water in a canal for a non-
maritime purpose is minimised.
(s 5(2) outcome) Not applicable.
12.10 Prescribed tidal works that are a The design and construction of the prescribed deck is consistent
prescribed deck and for a private purpose, are with the following standards— Not a deck for a private purpose.
designed and constructed in a way to ensure (a) subject to paragraph (c), a prescribed deck does not
the use of tidal water in a canal for a non- extend more than 3m from the waterfront boundary of the lot
maritime purpose is minimised. connected to the deck;
(b) subject to paragraph (c), a prescribed deck is at least
3m inside of the side boundary or extended side boundary
of the lot connected to the deck;
(c) if a relevant planning scheme standard is more stringent
than the standard mentioned in paragraph (a) or (b)—the
relevant planning scheme standard, to the extent it is more
stringent than the standard mentioned in paragraph (a) or
(b).
15
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.