Annex 13 - Schedule 3 - Prescribed Tidal Works

Attached to the e-mail DA Application - Noosa Oyster Project (2 of 3).

of 29

Page text shows just the words. Original shows the document exactly as it was published.

Coastal Protection and Management Regulation 2017
Schedule 3. Code for Assessable Development that is prescribed tidal works
Part 3 Performance outcomes and acceptable outcomes

 12.8 Appropriate measures are taken for          The design and construction of the prescribed tidal works is        Complies with Performance Outcome 12.8.
 prescribed tidal works for a non-private         consistent with the following standards—
 purpose to ensure an unsupportable live load     (a) subject to paragraph (b), prescribed tidal works have erected   The works are to be marked by a buoy with signage
 is not applied to the works by persons or        or placed in position on or near the works, a sign that—            indicating that the works are a restoration area.
 vehicles.                                        (i) is visible at all times; and                                    Details are available in section 7 of the Project
                                                                                                                      Restoration Plan.
                                                  (ii) states the maximum live load that may be applied to the
                                                  works, in terms of the maximum number of persons that may be
                                                  on the works at any given time or the maximum number of
                                                  vehicles of a particular type that may be on or moored at the
                                                  works at any given time;

                                                  (b) if a relevant planning scheme standard is more stringent
                                                  than the standard mentioned in paragraph (a)—the relevant
                                                  planning scheme standard, to the extent it is more stringent than
                                                  the standard mentioned in paragraph (a).

 12.9 Prescribed tidal works, other than a        The design and construction of the prescribed tidal works is        Not applicable.
 prescribed deck for a private purpose, are       consistent with each relevant planning scheme standard.
 designed and constructed in a way to ensure                                                                          Not in a canal.
 the use of tidal water in a canal for a non-
 maritime purpose is minimised.
                                                  (s 5(2) outcome)                                                    Not applicable.
 12.10 Prescribed tidal works that are a          The design and construction of the prescribed deck is consistent
 prescribed deck and for a private purpose, are   with the following standards—                                       Not a deck for a private purpose.
 designed and constructed in a way to ensure           (a) subject to paragraph (c), a prescribed deck does not
 the use of tidal water in a canal for a non-          extend more than 3m from the waterfront boundary of the lot
 maritime purpose is minimised.                        connected to the deck;

                                                      (b) subject to paragraph (c), a prescribed deck is at least
                                                      3m inside of the side boundary or extended side boundary
                                                      of the lot connected to the deck;

                                                      (c) if a relevant planning scheme standard is more stringent
                                                      than the standard mentioned in paragraph (a) or (b)—the
                                                      relevant planning scheme standard, to the extent it is more
                                                      stringent than the standard mentioned in paragraph (a) or
                                                      (b).


                                                                                                                                                                          15
Log in to download the original file

Annex 13 - Schedule 3 - Prescribed Tidal Works.pdf · 312 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.