Coastal Protection and Management Regulation 2017
Schedule 3. Code for Assessable Development that is prescribed tidal works
Part 3 Performance outcomes and acceptable outcomes

 7.2 The location and construction of             Vegetation on land affected by the prescribed tidal works is dealt   Complies with Performance Outcome 7.2
 prescribed tidal works ensures vegetation is     with in a way consistent with the following standards—
 cleared or disturbed only to the extent          (a) subject to paragraph (b), the clearing or disturbance of         The works only allow minor temporary impacts to
 reasonably necessary for the works.              vegetation for a purpose associated with the construction of         marine plants and terrestrial vegetation at the
                                                  prescribed tidal works, including, for example, parking for          Tewantin site (Refer ICM Drawing NROR-2021-04).
                                                  construction or workers’ vehicles or stockpiling of construction     While avoidance of this impact is possible, it is
                                                  materials—                                                           anticipated the works will provide considerable
                                                  (i) is avoided; or                                                   enhancement to the existing degraded habitat in this
                                                                                                                       location. The impact of the works is limited to the
                                                  (ii) if the clearing or disturbance of vegetation for a purpose      footprint of the individual reef patches, such that the
                                                  associated with the construction of the works can not be             works will retain any marine plants present in access
                                                  avoided—the clearing or disturbance is limited to the smallest       gaps between reef patches.
                                                  area of land reasonably necessary for the purpose;

                                                  (b) any other relevant planning scheme standard that is not
                                                  inconsistent with the standard mentioned in paragraph (a).

 7.3 After the construction of prescribed tidal   Land or vegetation affected by the prescribed tidal works is dealt   Complies with Performance Outcome 7.3
 works, any land damaged or destabilised by,      with in a way consistent with the following standards—
 and any vegetation damaged, destroyed or         (a) subject to paragraph (b)—                                        The works only allow minor temporary impacts to the
 removed by, the construction of the works is     (i) land surfaces damaged or destabilised by the prescribed tidal    significantly degraded habitat at the Tewantin site
 rehabilitated.                                   works are restored and stabilised; and                               (Refer ICM Drawing NROR-2021-04). The site will be
                                                                                                                       extensively habilitated with rocky substrate and oyster
                                                  (ii) vegetation damaged, destroyed or removed by prescribed          cultch as part of the proposed works. For detail, refer
                                                  tidal works is replaced with native vegetation for the locality      ICM drawings and Project Restoration Plan.
                                                  within which the works are located, to the extent it is reasonably
                                                  practicable to replace the vegetation with native vegetation;

                                                  (b) if a relevant planning scheme standard is more stringent
                                                  than the standard mentioned in paragraph (a)—the relevant
                                                  planning scheme standard, to the extent it is more stringent than
                                                  the standard mentioned in paragraph (a);

                                                  (c) any other relevant planning scheme standard that is not
                                                  inconsistent with the standards mentioned in paragraphs (a) and
                                                  (b).




                                                                                                                                                                                 6
Log in to download the original file

Annex 13 - Schedule 3 - Prescribed Tidal Works.pdf · 312 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.