Annex 13 - Schedule 3 - Prescribed Tidal Works
Attached to the e-mail DA Application - Noosa Oyster Project (2 of 3).
Coastal Protection and Management Regulation 2017
Schedule 3. Code for Assessable Development that is prescribed tidal works
Part 3 Performance outcomes and acceptable outcomes
7.2 The location and construction of Vegetation on land affected by the prescribed tidal works is dealt Complies with Performance Outcome 7.2
prescribed tidal works ensures vegetation is with in a way consistent with the following standards—
cleared or disturbed only to the extent (a) subject to paragraph (b), the clearing or disturbance of The works only allow minor temporary impacts to
reasonably necessary for the works. vegetation for a purpose associated with the construction of marine plants and terrestrial vegetation at the
prescribed tidal works, including, for example, parking for Tewantin site (Refer ICM Drawing NROR-2021-04).
construction or workers’ vehicles or stockpiling of construction While avoidance of this impact is possible, it is
materials— anticipated the works will provide considerable
(i) is avoided; or enhancement to the existing degraded habitat in this
location. The impact of the works is limited to the
(ii) if the clearing or disturbance of vegetation for a purpose footprint of the individual reef patches, such that the
associated with the construction of the works can not be works will retain any marine plants present in access
avoided—the clearing or disturbance is limited to the smallest gaps between reef patches.
area of land reasonably necessary for the purpose;
(b) any other relevant planning scheme standard that is not
inconsistent with the standard mentioned in paragraph (a).
7.3 After the construction of prescribed tidal Land or vegetation affected by the prescribed tidal works is dealt Complies with Performance Outcome 7.3
works, any land damaged or destabilised by, with in a way consistent with the following standards—
and any vegetation damaged, destroyed or (a) subject to paragraph (b)— The works only allow minor temporary impacts to the
removed by, the construction of the works is (i) land surfaces damaged or destabilised by the prescribed tidal significantly degraded habitat at the Tewantin site
rehabilitated. works are restored and stabilised; and (Refer ICM Drawing NROR-2021-04). The site will be
extensively habilitated with rocky substrate and oyster
(ii) vegetation damaged, destroyed or removed by prescribed cultch as part of the proposed works. For detail, refer
tidal works is replaced with native vegetation for the locality ICM drawings and Project Restoration Plan.
within which the works are located, to the extent it is reasonably
practicable to replace the vegetation with native vegetation;
(b) if a relevant planning scheme standard is more stringent
than the standard mentioned in paragraph (a)—the relevant
planning scheme standard, to the extent it is more stringent than
the standard mentioned in paragraph (a);
(c) any other relevant planning scheme standard that is not
inconsistent with the standards mentioned in paragraphs (a) and
(b).