Original source · versioned page text
Attachment B - Code Compliance Assessment
Performance Outcomes Acceptable Outcomes Planning Comment
(b) match Council infrastructure. Drawings as appropriate for the particular accordance with Council’s Standard
type of development as annotated on the Drawings.
drawings.
AO2.2
The change of grades in driveways and
ramps is in accordance with Council’s
Standard Drawings.
PO3 AO3.1 Complies
The number of driveways across Design of multi-tenanted developments The development is replacing the existing
pedestrian footpaths is minimised. include shared driveways and parking driveway crossover with another suitable
areas. driveway crossover approximately in the
centre of the site’s frontage. Adjoining
AO3.2 developments do not have driveways that
Driveways are located so they abut existing are on the shared boundaries.
driveways of adjoining development where
practicable and reciprocal easements are
created to reduce the sealed driveway
width.
PO4 AO4 Complies
Vehicular access does not adversely impact Footpath and kerb crossings are located The development is replacing the existing
on the capacity, operations and clear of existing stormwater inlet driveway crossover with another suitable
maintenance of the existing infrastructure. structures, water and sewerage driveway crossover approximately in the
infrastructure fittings, any other exiting centre of the site’s frontage. This move
utility infrastructure, existing landscaping does not adversely impact on the capacity,
and vegetation. operations and maintenance of the
existing infrastructure. No new footpath
jrey.au | (07) 3106 3221 | [email protected]
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Attachment B - Code Compliance Assessment.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.