Attachment B - Code Compliance Assessment

of 159
 Performance Outcomes                          Acceptable Outcomes                          Planning Comment
 Effects of works
 Drainage
 PO1                                           AO1                                          Complies
 Finished surface levels ensure land is free   Filled or excavated areas have a minimum     To fit within the building height limit, the
 draining.                                     gradient of 0.5% and drain to Council’s      ground floor is raised to allow sufficient
                                               stormwater infrastructure where available,   height for the lower floor level. Compacted
                                               or where stormwater infrastructure is not    fill is used to raise driveway and
                                               available, toward the street.                landscaping levels to meet the higher
                                                                                            ground floor from the street. There will be
                                                                                            sufficient fall to Rene Street and available
                                                                                            stormwater infrastructure nearby. The
                                                                                            lower ground level is excavated and there
                                                                                            is sufficient fall to available stormwater
                                                                                            infrastructure to the rear.
 Hydraulics
 PO2                                                                                        Complies
 Change to the levels on site do not have an   No acceptable outcome provided               There is sufficient stormwater
 adverse impact on the flooding and                                                         infrastructure capacity in the surrounding
 drainage characteristics off-site.                                                         area. This development does not interfere
                                                                                            with the characteristics of the drainage line
                                                                                            to the rear of the site.
 Geotechnical considerations
 PO3                                           AO3.1                                        Complies
 Earthworks do not result in geotechnical      Filling works are undertaken in accordance   All earthworks are to be undertaken in
 instability on-site or to nearby premises.    with Council’s Planning Scheme Policy PSP6   accordance with Council’s Planning
                                               Engineering design standards - roads,        Scheme Policy 6 with further details
                                               drainage and earthworks.                     provided at Building Works stage.




jrey.au | (07) 3106 3221 | [email protected]

Log in to download the original (Attachment B - Code Compliance Assessment.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.