Skip to the record
Mmm.. taste the original NoosaWatch™

Original source · versioned page text

Attachment B - Code Compliance Assessment

of 159
 Performance Outcomes                         Acceptable Outcomes                          Planning Comment
                                              AO3.2
                                              Where the filling is for residential,
                                              commercial or industrial purposes the
                                              works comply with Australian Standard -
                                              Guidelines for earthworks on commercial
                                              & residential development.
 Local amenity
 PO4                                          AO4.1                                        Complies
 Undertaking earthworks does not              The following control measures are           All earthworks are to be undertaken in
 adversely impact on the amenity of the       implemented—                                 accordance with Council’s Planning
 local area by way of dust, noise or visual      (a) regular water spraying of exposed     Scheme Policy with further details
 amenity.                                            areas to suppress dust;               provided at Building Works stage.
                                                 (b) provision of dust stabilised or
                                                     sealed internal roads;
                                                 (c) protective covering of exposed
                                                     areas that are left for more than 2
                                                     weeks; and
                                                 (d) unless a development permit
                                                     provides otherwise, disturbed areas
                                                     are revegetated using species
                                                     identified in Council's Planning
                                                     Scheme Policy PSP2 Landscaping.

                                              AO4.2
                                              Earthworks are undertaken only during the
                                              hours of 7:00am to 6:00pm, Monday to
                                              Friday and 7:00am to 3:00pm on Saturday.




jrey.au | (07) 3106 3221 | [email protected]

Log in to download the original (Attachment B - Code Compliance Assessment.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.