Attachment B - Code Compliance Assessment
Performance Outcomes Acceptable Outcomes Planning Comment
No work is undertaken on Sunday or public
holidays.
Vegetative waste
PO5 AO5.1 Complies
Vegetation cleared from a development Cleared vegetation is transported off-site Vegetation to be cleared will be mulched
site is disposed of in an environmentally for disposal in an approved green waste on-site and reused for landscaping of the
responsible manner. disposal facility. finished development. Where this is not
possible, cleared vegetation will be
AO5.2 disposed of in an environmentally
Cleared vegetation is mulched on-site and responsible manner.
reused for landscaping of the finished
development.
AO5.3
Cleared vegetation is disposed of for the
purpose of firewood.
AO5.4
Disposal of vegetative waste by burning off
is avoided.
Managing contamination risk
PO6 AO6.1 Complies
Materials used as fill are suitable for Fill material is solid clean earth, free of The site is not on the contaminated land
development and future use of the land putrescible or refuse material, vegetation, register.
and filling or excavation works do not acid sulfate soils, building or construction
result in the contamination of land. material or other material or
contaminants.
jrey.au | (07) 3106 3221 | [email protected]
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (Attachment B - Code Compliance Assessment.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.