Skip to the record
Beware of cheap imitations.

Original source · versioned page text

Attachment B - Code Compliance Assessment

of 159
 Performance Outcomes                        Acceptable Outcomes                            Planning Comment
                                             No work is undertaken on Sunday or public
                                             holidays.
 Vegetative waste
 PO5                                         AO5.1                                          Complies
 Vegetation cleared from a development       Cleared vegetation is transported off-site     Vegetation to be cleared will be mulched
 site is disposed of in an environmentally   for disposal in an approved green waste        on-site and reused for landscaping of the
 responsible manner.                         disposal facility.                             finished development. Where this is not
                                                                                            possible, cleared vegetation will be
                                             AO5.2                                          disposed of in an environmentally
                                             Cleared vegetation is mulched on-site and      responsible manner.
                                             reused for landscaping of the finished
                                             development.

                                             AO5.3
                                             Cleared vegetation is disposed of for the
                                             purpose of firewood.

                                             AO5.4
                                             Disposal of vegetative waste by burning off
                                             is avoided.
 Managing contamination risk
 PO6                                         AO6.1                                          Complies
 Materials used as fill are suitable for     Fill material is solid clean earth, free of    The site is not on the contaminated land
 development and future use of the land      putrescible or refuse material, vegetation,    register.
 and filling or excavation works do not      acid sulfate soils, building or construction
 result in the contamination of land.        material or other material or
                                             contaminants.




jrey.au | (07) 3106 3221 | [email protected]

Log in to download the original (Attachment B - Code Compliance Assessment.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.