Attachment B - Code Compliance Assessment
Performance Outcomes Acceptable Outcomes Planning Comment
AO6.2
The site is not on the contaminated land
register.
Haulage activity and amenity
PO7 Complies
Haulage of material to and from a site No acceptable outcome provided Any proposed haulage route associated
ensures— with development construction works will
(a) minimal disturbance to occur along Rene Street, an established
neighbouring properties and industrial road, to access the higher order
properties along the haulage route; road network, Eumundi-Noosa Road or to
and Walter Hay Drive via Hofman Drive.
(b) Council’s road infrastructure
including pavements is not
adversely affected.
Extent of earthworks
PO8 AO8 Complies
The layout of the development provides All earthworks, including cut and fill Development works are to be contained
adequate, clearly defined and easily batters, retaining walls and the like are within the subject site.
accessible— contained within the subject site.
(a) on-site vehicle parking and
manoeuvring areas; and
(b) loading and manoeuvring areas for
delivery and service vehicles.
Sloping sites
PO9 AO9 Performance
On sloping sites development follows the Cut or fill is less than 1.5 metres in depth To fit the development within the building
natural landform wherever practical and relative to the natural ground level. height limit, the lower level is at FFL 8.1
excavation or filling is minimal.
jrey.au | (07) 3106 3221 | [email protected]
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (Attachment B - Code Compliance Assessment.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.