Council archive · source document
20517 App I.pdf [As Published] · 132007.1259
$6.2. As constructed data is submitted in accordance with Section 6 of PSP 5 Engineering Design Standards - Roads, Drainage and Earthworks; AND $6.3 Stormwater drainage planning, design and construction is in accordance with the Queensland Urban Drainage Design Manual. Stormwater design and construction will be undertaken in accordance with Section 4 of PSP 5 Engineering Design Standards — Roads, Drainage and Earthworks and the Queensiand Urban Drainage Design Manual, during the Operational Works Phase. As Constructed data will be submitted in accordance with Section 6 of PSP 5 Engineering Design Standards — Roads, Drainage and Earthworks upon completion of construction. $7.1 Road and stormwater drainage infrastructure is constructed in accordance with: (a) Sections 2,3 and 4 of PSP5 Engineering Design Standards — Roads, Drainage and Earthworks; (b} Queensland Design Code for Residential Streets; (c) AUSTROADS; or (d) A combination of the principles of these documents. AND $7.2 Erosion and _ sediment control measures are designed and implemented in accordance with the Institution of Engineers Australia (Qld Division) Soil Erosion and Sediment Control — Guidelines for Queensland Construction Sites. Roads and stormwater drainage will be constructed in accordance with Sections 2, 3 and 4 of PSP 5 Engineering Design Standards — Roads, Drainage and Earthworks, Queensland Design Code for Residential Streets and Austroads. -
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
20517 App I.pdf [As Published]Related documentApplication case desk ↗
About this file
- File size
- 5.2 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.