Approved Plans and Documents - OPW22/0303
• A fauna incident or interactions register is to be updated daily throughout
clearing operations.
•
Personnel Stockwell Design and Construction is held accountable for:
responsible • Ensuring a suitably qualified fauna spotter catcher is present for all vegetation
clearing
• Working with the Fauna Spotter Catcher to manage any animal welfare issues
identified (for example, active nests).
• Ensuring all personnel are reminded of their responsibility to uphold animal
welfare by preventing and / or minimizing the risk of distress, injury, illness,
orphanage, predation, or death of fauna.
• Ensuring all personnel understand that fauna is not to be handled by anyone
except the licensed spotter catcher.
• Ensuring that clearing works cease temporarily if an animal is injured, to allow
the fauna spotter catcher time to assess the level of injury and determine the
next steps required
The Clearing Contractor is responsible for
• Communicating clearly and effectively with the fauna spotter catcher, by use
of radio, hand signals or other agreed upon methods
• Working carefully and under the impression that fauna may be concealed
within vegetation
• Working with the Fauna Spotter Catcher to manage any animal welfare issues
identified
• Not continuing to clear vegetation while the Fauna Spotter Catcher is
managing fauna
The Fauna Spotter Catcher / Ecologist is responsible for
• Capturing and relocating fauna
• Maintaining detailed records of fauna interactions and fauna habitats cleared,
and preparing reports
Reporting and • A breeding place register is to be maintained by the Fauna Spotter Catcher
Auditing • A fauna register is to be maintained by the Fauna Spotter Catcher
• The Fauna Spotter Catcher / Ecologist is to provide Stockwell Design and
Construction with completed registers, for submission to DES at the end of
construction
Corrective Action • In the case where monitoring acknowledges practices that re inconsistent with
the strategies developed for the associated management plan, the Contractor
shall carry out the necessary corrective process and write them up in a monthly
report which is then reviewed by a Site Superintendent.
Timing • Length of the construction period
FAUNA MANAGEMENT PLAN | Stockwell Design and Construction 15
Document Set ID: 22315061
Version: 1, Version Date: 20/02/2023
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (Approved Plans and Documents - OPW22_0303.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.