10.   The developer must obtain all of the other Development Permits referred to in the Decision
      Notice, prior to obtaining a Development Permit for building works.
11.   All hot water systems installed shall be either solar systems; electric heat pump systems or
      gas systems (LPG or natural).
12.   The proposed development shall have all kitchen, laundry and bathroom fittings that comply
      with the AAA Water Conservation Rating System as defined by the AS/NZS 6400 (Water
      Efficient Products – Rating and Labelling 2003) and AS/NZS 3500 (National Plumbing and
      Drainage Standard Part 1.2), with toilets to comply with AAAA Water Conservation Rating
      System. All tap ware and shower roses shall not exceed a maximum flow of 9 litres per min.
      Dishwashers, baths, spa baths and washing machines are excluded from this requirement.
13.   A verification survey of the building is to be carried out by a Licensed Surveyor and a
      certificate lodged with Council at completion of the work confirming compliance with the
      minimum floor level required by the provisions of the Planning Scheme, and the maximum
      building height above natural ground level of 8.5m in accordance with the approved plans.
Land Development
14.   For the purpose of these conditions: -
      1.4   A Plan of Survey means the plan for the reconfiguration of a lot required to be
            approved by Council pursuant to S3.7.1 of the Integrated Planning Act 1997.
      1.5   A registered Professional Civil Engineer means an civil engineer who is listed under
            the Institution of Engineers, Australia “National Professional Engineers Register 3”
            (NPER 3) or an engineer who is registered in Queensland pursuant to the Professional
            Engineers Act 1988.
      1.6   The person acting on this permit means any person or company who undertakes
            development pursuant to this permit.
      1.7   Principal Contractor means the person nominated by the Applicant and approved by
            the Manager - Land Development at a pre-start meeting as being responsible for the
            major component of works associated with a Development Permit for Operational
            Works of any works on the site.
15.   The lot reconfiguration shall be in accordance with plan 03014A.DWG dated 19/03/2004,
      prepared by Noosa Mapping & Surveys Pty Ltd, except as modified herein and subject to
      Council endorsement of the Plan of Survey.
16.   A registered easement shall be created over the zone of influence of all Council sewer mains
      within the subject site and over those parts of the subject site that are impacted upon by
      sewers on any adjoining sites. The easements shall generally be parallel to and centred over
      the sewer main and be equivalent in width to twice the depth to invert level of the sewer at the
      deepest point within the allotment (measured from the finished surface) and be no less than
      3.0 metres wide. In this regard a licensed surveyor shall accurately locate all sewer mains
      and determine the necessary width of the easement, which shall be shown on any plans
      submitted for Operational Works / Building Works approval and on the Plan of Survey to be
      submitted for Council’s endorsement. To this extent the surveyor shall certify that the sewer
      and the zone of influence is wholly contained within the easement to be created.
17.   Prior to the endorsement of the Plan of Survey, the Applicant’s Solicitor shall give Council’s
      Solicitor an appropriate undertaking in writing that in conjunction with lodgement of the Plan of
      Survey at the Land Titles Office, the Title Deed and the easement documents will also be
      lodged and any additional Titles Office forms or requisitions requiring the consent of Council
      will be attended to forthwith.
18.   In conjunction with the lodgement of the Plan of Survey for Council endorsement, legal
      documentation shall be presented to Council and shall be submitted in the correct form with
      fees prescribed in Council’s adopted fee schedule.
                                                                                     Page 3 of 14

Used in these records

About this file

File size
81 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Notice - Change to an Existing Approval - 010.2004.00004206.001 [As Published].pdf · 81 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.