Amended Negotiated Decision Notice RAL20-0021 [As Published]
5. REFERRAL AGENCIES
The referral agencies applicable to this application are:
Referral Status Referral Agency and Referral Trigger Response
Address
Concurrence SARA at DILGP SARA Schedule 10, Part 9, The agency provided its
at DILGP Via MyDAS2 Division 4, Subdivision 2, response on
at https://prod2.dev- Table 1, Item 1 4 November 2020
assess.qld.gov.au/suite (10.9.4.2.1.1)— (Reference No. 2010-
/ (for assistance, Reconfiguring a lot within 19147 SRA). A copy of
contact DILGP at 5352 25m of a state transport the response is
9701 or corridor (Planning attached
email:SEQNorthSARA Regulation 2017)
@dilgp.qld.gov.au
Schedule 10, Part 9, The agency provided its
Division 4, Subdivision 2, response on
Table 3, Item 1 4 November 2020
(10.9.4.2.3.1)— (Reference No. 2010-
Reconfiguring a lot within 19147 SRA). A copy of
100m of a state- the response is
controlled road attached
intersection (Planning
Regulation 2017)
6. ADVISORY NOTES
The following notes are included for guidance and information purposes only and do not form part
of the assessment manager conditions:
Building and Construction Industry (Portable Long Service Leave) Levy
1. The QLeave levy must be paid prior to the issue of a development permit where it is required.
Council will not be able to issue a Decision Notice without receipt of details that the Levy has
been paid.
Co-ordination of Operational Works Assessment
2. Additional application fees apply to Operational Work applications where the different
aspects of the works are lodged separately. Significant savings in application fees will result
if all works are lodged in a single application.
Preparation of a Preliminary Construction Management Plan
3. A preliminary Construction Management Plan must be submitted with the Operational Works
application and must address the following:
a. traffic management during all aspects of the construction phase including:
i. a Traffic Management Control Plan in accordance with the Manual of Uniform
Traffic Control Devices (MUTCD) detailing all temporary signage and traffic
control measures prior to construction.
ii. maintenance of safe pedestrian access for the areas affected by the works during
and after daily construction has ceased.
iii. proposed fencing to the site during the construction phase of the development.
iv. approval of the Traffic Management Control Plan by the Department of Transport
and Main Roads (DTMR) for any works on State controlled roads.
v. provision for worker car parking.
Page 8 of 19
Document Set ID: 21606483
Version: 1, Version Date: 07/09/2021