NOOSA COUNCIL IDAS Development Application Decision Notice                                                       4


11.    The requirements of this development approval are to be effected, prior to the use of the premises.
       Council reserves the right to call upon the bond or guaranteed sum referred to in this approval to effect
       compliance with conditions.

12.    The Development Permit for a material change of use of premises lapses if the use has not happened by
       29 November 2009, unless an application to extend the currency is approved by Council.

13.    The developer must obtain all of the other Development Permits referred to in the Decision Notice, prior to
       obtaining a Development Permit for Building Works.

14.    Should the rainwater tanks be located between the building and the seaward boundary, the tanks shall be
       located below surface level and vegetated in accordance with this permit.

15.    External materials and finishes shall comprise predominately of colours and hues of the surrounding
       landscape.
Land Development

Vehicle Access
16.    A vehicular access driveway to serve the development shall be constructed from the Seaview Terrace
       frontage of the site with a maximum width of 5.0m within Seaview Terrace and at the property boundary.

17.    The driveway shall be designed and constructed to Council’s design standards and to grades that prevent
       vehicles from scraping and/or bottoming whilst also allowing pedestrians movements along the footpath
       without any level difference. Should any driveways be constructed to grades that do not comply with
       AS/NZS 2890.1-2004 and Council’s Standard Drawing No. 9020, Council will require that the driveway be
       removed and reconstructed to levels that do comply.
       Please note, a step between the driveway and the footpath shall be avoided, as it is preferred to have the
       footpath continue at a constant grade to minimise the potential for pedestrians to trip or fall.
18.    The fencing and landscaping adjacent to the driveway shall be designed and constructed in order to
       maintain sight lines in accordance with AS/NZS 2890.1:2004.
Car Parking

Off Street
19.    Carparking shall be provided within the site as shown on drawing number SD.01 dated May 07 by Kidd
       and Co. except as modified herein.

20.    The carparking area shall be designed to comply with the provisions of AS/NZS 2890.1-2004 for user
       class 1A with a minimum head clearance (headroom) at any point of 2.2m.

21.    All carparking shall be kept and maintained in a condition fit for use as carparking.
Frontage Works
22.    All redundant vehicular crossings to the site shall be removed and replaced by kerb & channel, footpath
       paving and landscaping such as trees and grasses in accordance with Council’s Standard specifications
       prior to commencement of the use permitted by this permit.
Roof Water & Stormwater Drainage
23.    Roof runoff from any building shall be directed to a rainwater storage system or tank (minimum storage
       5000 litres per dwelling) that is installed to ensure water from the tank is used for external uses (such as
       watering gardens, irrigation, ornamental ponds, water features, topping-up swimming pools, outdoor
       cleaning, etc) and for use in flushing of toilets internal to the building. All rainwater tanks are to be
       designed and installed in accordance with the Queensland Development Code (QDC), Part 25 –
       Rainwater Tanks, and shall be part of the plumbing application in conjunction with the building approval.
       The location and capacity of the tanks shall be clearly shown on the plans submitted for Building Works.

24.    All surface stormwater runoff shall be directed underground into an on-site disposal system.

25.     Plans of the drainage design shall be prepared by a Registered Professional Civil Engineer and
       submitted to Council prior to obtaining a Development Permit for Operational Works. Can we ask for this

26.    All stormwater drainage (including roof water overflow from the rainwater storage system) shall be
       collected and discharged so there is no net increase in stormwater runoff from the site.




AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@e80859de\@[email protected]
Log in to download the original file

Attachment C - 2007 decision notice.pdf · 100 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.