                                                                                                                                                              EARTH WORKS CODE
                                                                                                                                      Performance Criteria and Acceptable Solutions


                                                          ACCEPTABLE SOLUTIONS
                                                           (IF SELF-ASSESSABLE)                                                                                        COUNCIL USE
           PERFORMANCE CRITERIA                                                                  SOLUTIONS*                      COMMENTS
                                                           PROBABLE SOLUTIONS                                                                                             ONLY
                                                           (IF CODE ASSESSABLE)
                                                   S6.2 The site is not on the contaminated         A/S       Refer to PF80 – Cooroy Care Farm Stormwater
                                                   land register.                                             Management Plan (Bligh Tanner, May 2018)

                                                                                                              Site is not on the contaminated land register
    Haulage activity and amenity                                                                    A/S       Refer to PF80 – Cooroy Care Farm Stormwater
    O7 Haulage of material to and from a site      No solution provided.                                      Management Plan (Bligh Tanner, May 2018)
    ensures—
    a) minimal disturbance to neighbouring                                                                    Works to be undertaken in accordance with all
       properties and properties along the                                                                    relevant earthworks/erosion and sediment control
       haulage route; and                                                                                     requirements and project specifications.
    b) Council’s road infrastructure including
       pavements is not adversely affected.
    Extent of earthworks                                                                            A/S       Refer to PF80 – Cooroy Care Farm Stormwater
    O8 Earthworks are contained within the         S8.1 All earthworks, including cut and fill                Management Plan (Bligh Tanner, May 2018)
    subject property.                              batters, retaining walls etc are contained
                                                   within the subject site.                                   All earthworks, including cut and fill batters,
                                                                                                              retaining walls etc are contained within the subject
                                                                                                              site.
    Environmental protection                                                                        A/S       Refer to PF80 – Cooroy Care Farm Stormwater
    O9 Earthworks minimise any adverse             No solution provided.                                      Management Plan (Bligh Tanner, May 2018)
    impact upon groundwater, watercourses,
    drainage lines, wetlands, and native                                                                      Site layout minimises impact to existing drainage
    vegetation.                                                                                               lines and watercourses
    Dams                                                                                            N/A       Refer to PF80 – Cooroy Care Farm Stormwater
    O10 Dam location and construction does         No solution provided.                                      Management Plan (Bligh Tanner, May 2018)
    not impact upon neighbouring properties in
    terms of—                                                                                                 No neighbouring properties to dam. Site layout
    a) hydrology;                                                                                             avoids any buildings below dam or within drainage
    b) alteration of existing overland flowpaths                                                              corridor.
        and patterns;
    c) landslide or failure of dam wall; and
    d) effluent disposal areas.




1       Solution: ✓ = Acceptable Solution
                  A/S = Alternative Solution                                                                                                                         Cooroy Care Farm
                  N/A = Not applicable to this proposal

521 Elm Street and 10-22 Rose Gum Road, Black Mountain                     Commenced 3 February 2006 – Amended 3 March 2008                                                  Page 3
Log in to download the original file

Appendix Q - Planning Scheme Code Responses.pdf · 1.9 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.