Appendix Q - Planning Scheme Code Responses
EROSION AND SEDIMENT CONTROL CODE
Performance Criteria and Acceptable Solutions
Table 14-52 – Erosion and sediment control
PROBABLE SOLUTIONS COUNCIL USE
PERFORMANCE CRITERIA SOLUTIONS* COMMENTS
(IF CODE ASSESSABLE) ONLY
14.147 Effects of works
Erosion and sediment control A/S Refer to PF80 – Cooroy Care Farm Stormwater
O1 Development minimises erosion and S1.1 Site disturbance is limited to building Management Plan (Bligh Tanner, May 2018)
transport of sediments off-site. areas, their surrounds and other use areas;
AND All site disturbance, including cut and fill batters,
retaining walls etc will be contained within the
subject site.
S1.2 Sediment barriers are provided A/S Refer to PF80 – Cooroy Care Farm Stormwater
throughout and downslope of disturbed Management Plan (Bligh Tanner, May 2018)
areas to prevent sediment washing into
gutters, drains and watercourses either on Works to be undertaken in accordance with all
or off the site; relevant earthworks/erosion and sediment control
AND requirements and project specifications.
S1.3 All stockpiles including sand, soil or A/S Refer to PF80 – Cooroy Care Farm Stormwater
building materials are within the premises Management Plan (Bligh Tanner, May 2018)
and contained within individual sediment
barriers; All stockpiles will be contained within the subject
AND site and contained within individual sediment
barriers
S1.4 Sediment basins are provided where A/S Refer to PF80 – Cooroy Care Farm Stormwater
the site contains fine or dispersive soils; Management Plan (Bligh Tanner, May 2018)
OR
Works to be undertaken in accordance with all
relevant earthworks/erosion and sediment control
requirements and project specifications.
S1.5 A stormwater catchpit incorporating a A/S Refer to PF80 – Cooroy Care Farm Stormwater
stormwater catchpit protection device is Management Plan (Bligh Tanner, May 2018)
installed so that all runoff from disturbed
areas flows to the catchpit; Works to be undertaken in accordance with all
AND relevant earthworks/erosion and sediment control
requirements and project specifications.
1 Solution: ✓ = Acceptable Solution
A/S = Alternative Solution Cooroy Care Farm
N/A = Not applicable to this proposal
521 Elm Street and 10-22 Rose Gum Road, Black Mountain Commenced 3 February 2006 – Amended 3 March 2008 Page 1
See the original