Appendix Q - Planning Scheme Code Responses

of 88

Page text shows just the words. Original shows the document exactly as it was published.

                                                                                                                                    EROSION AND SEDIMENT CONTROL CODE
                                                                                                                                 Performance Criteria and Acceptable Solutions


                                                         PROBABLE SOLUTIONS                                                                                     COUNCIL USE
         PERFORMANCE CRITERIA                                                                 SOLUTIONS*                     COMMENTS
                                                         (IF CODE ASSESSABLE)                                                                                      ONLY
                                                S1.6 For buildings,                              A/S       Refer to PF80 – Cooroy Care Farm Stormwater
                                                (a) temporary or permanent downpipes                       Management Plan (Bligh Tanner, May 2018)
                                                    are connected to the stormwater
                                                    system before laying the roof; or                      Works to be undertaken in accordance with all
                                                (b) localised erosion is avoided by                        relevant earthworks/erosion and sediment control
                                                    directing flow from downpipes over                     requirements and project specifications.
                                                    non-erosive areas.
    Stormwater runoff                                                                            A/S       Refer to PF80 – Cooroy Care Farm Stormwater
    O2 Stormwater is       diverted   around    S2.1 Diversion drains or bunds are                         Management Plan (Bligh Tanner, May 2018)
    disturbed areas.                            designed and constructed to drain
                                                upstream run-off around the disturbed site;                Works to be undertaken in accordance with all
                                                and                                                        relevant earthworks/erosion and sediment control
                                                                                                           requirements and project specifications.
                                                S2.2 Discharge from the diversion drains         A/S       Refer to PF80 – Cooroy Care Farm Stormwater
                                                do not cause run-off impacts to other                      Management Plan (Bligh Tanner, May 2018)
                                                properties;
                                                OR                                                         Works to be undertaken in accordance with all
                                                                                                           relevant earthworks/erosion and sediment control
                                                                                                           requirements and project specifications.
                                                S2.3 Alternative methods, as described in        A/S       Refer to PF80 – Cooroy Care Farm Stormwater
                                                the Institution of Engineers Australia                     Management Plan (Bligh Tanner, May 2018)
                                                (Queensland Division) Soil Erosion and
                                                Sediment Control - Legislation and                         Works to be undertaken in accordance with all
                                                requirements for Queensland Construction                   relevant earthworks/erosion and sediment control
                                                Sites, are used.                                           requirements and project specifications.




1      Solution: ✓ = Acceptable Solution
                 A/S = Alternative Solution                                                                                                                   Cooroy Care Farm
                 N/A = Not applicable to this proposal

521 Elm Street and 10-22 Rose Gum Road, Black Mountain                  Commenced 3 February 2006 – Amended 3 March 2008                                               Page 2
Log in to download the original file

Appendix Q - Planning Scheme Code Responses.pdf · 1.9 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.