Original source · versioned page text
2015-01-15 Ordinary Meeting Agenda
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
ORDINARY MEETING AGENDA 15 JANUARY 2015
of Australian Standard AS3798: Guidelines on Earthworks for Commercial and
Residential Developments.
21. Where the development involves excavation or filling over, or adjacent to,
drainage, water supply or sewerage infrastructure, all access chamber surface
levels must be adjusted to provide a freeboard of 100mm above the finished
ground surface level.
Damage to Services and Assets
22. Any damage caused to existing services and assets as a result of the
development works must be repaired at no cost to the asset owner at the
following times:
a. where the damage would cause a hazard to pedestrian or vehicle safety,
immediately; or
b. where otherwise, upon completion of the works associated with the
development.
Any repair work which proposes to alter the alignment or level of existing
services and assets must first be referred to the relevant service authority for
approval.
Signage
23. All advertising signage must comply with the Advertising Devices Code.
Waste Management
24. Refuse storage, removal and collection facilities must be provided in
accordance with the following:
a. provision of separate bins (240l wheelie bins or 1.1 m 3 bulk bins) for
general and recyclable waste for the site
b. collection by service vehicles from the kerbside of the internal common
property road frontage
c. provision of a hardstand impervious area within the site for the permanent
storage location of the bins, having minimum dimensions of 0.36 m 2
(600mm x 600mm) per bin
d. provision of a 1.5m high purpose built enclosure to the storage location
which is screened from the street
e. provision of a wash-down area in the vicinity of the permanent storage
location fitted with a hose-cock and a drain connected to the sewer that
has a stormwater catchment area of no more than 1m².
OPERATIONAL WORKS
Prior to Commencement of Works
25. Council must be contacted at least 5 working days prior to any works
commencing to organise a prestart. The contact number to arrange a pre-start
meeting is 5329 6244. The pre-start meeting must include the relevant parties
for the following aspects of the works:
a. Civil engineering works;
b. Erosion and sediment control works
26. A Construction Management Plan must be submitted to Council prior to the pre-
start meeting and must specifically address the following:
a. Traffic Management during all aspects of the construct phase including:
(i) A Traffic Management Control Plan in accordance with Manual of
Uniform Traffic Control Devices (MUTCD) detailing all temporary
signage and traffic control measures prior to construction
Page 10 of 32
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.