ORDINARY MEETING AGENDA 15 JANUARY 2015
(ii) Maintenance of safe pedestrian access across the frontage of the
site both during daily construction and after daily construction has
ceased
(iii) Proposed fencing to the site during the construction phase of the
development
(iv) Adequate parking arrangements for construction workers
b. Maintenance and protection of water quality and existing drainage lines
through the construction site through the implementation of appropriate
erosion and sediment control measures
c. Works program identifying key components of the works and their
respective durations
d. Establishment of a communication protocol with the general public,
adjoining owners, emergency services and local businesses to advise of
construction times, impacts on traffic and services and other relevant
issues
27. Any conflict between the development and an existing or proposed service
must be referred to the relevant service authority for determination prior to
commencement of works.
During Construction
28. The developer must meet any costs to repair damage to any Council asset
during construction, where damage is a result of the development works.
Damage to assets must be repaired immediately where it creates a hazard to
the community. In circumstances where the damage does not create a hazard
to the community, it must be repaired immediately on completion of the works
associated with the development. A condition report including photographs of
the Rene Street frontage of the site should be completed and submitted to
Council at the prestart meeting.
29. All works must be supervised by a Registered Professional Engineer of
Queensland (RPEQ) who is independent of the Developer and Principal
Contractor, and they must certify that all works conform to the Operational
Works permit. Where municipal works are involved, such confirmation must be
submitted for the respective hold points prior to any site inspection by Council
Officers.
30. All works must be constructed in accordance with:
a. The approved plans/documents and conditions detailed in this Decision
Notice
b. All relevant Noosa Council Planning Scheme Policies, standard drawings,
standard specifications and guidelines
c. The latest version of the Healthy Waterways document “Water Sensitive
Urban Design Technical Design Guidelines for South East Queensland”
for all water quality devices to be constructed on site.
Bioretention Basins
31. During construction and establishment of the bioretention devices, the
supervising RPEQ must certify that the device was constructed in accordance
with Construction and Establishment Guidelines: Swales, Bioretention Systems
and Wetlands (Water by Design, 2009) and that the forms contained in section
3.15 of the guidelines, including the associated supporting information and
data, are completed. These forms and certification must be submitted to
council prior to commencement of use.
Page 11 of 32