ORDINARY MEETING AGENDA 15 JANUARY 2015
32. A construction hold point with a council delegate must be established once the
contributing catchment is effectively stabilised with at least 80% groundcover,
and bioretention device underdrainage pipe work is installed.
33. At the time of the construction holdpoint, a sample of the drainage layer,
transition layer, and filtration media materials must be stockpiled onsite
accompanied by laboratory results that demonstrate that the media complies
with the specifications contained in the latest version of the Guidelines for Soil
Filter Media in Bioretention Systems (Facility for Advancing Water Biofiltration)
and that the minimum hydraulic conductivity of 180mm/hr or as specified on the
approved engineering plans will be achieved.
34. The bioretention underdrains and cleanout points must be provided as uPVC
pipe generally as shown on IPWEAQ Standard DrawingWSUD-003.
35. Where the bioretention filter media interfaces with stormwater pits and retaining
walls, nonwoven geotextile must be fixed to the pit/retaining wall and extend
300mm out into the filter media generally in accordance with IPWEAQ Standard
Drawing WSUD-001 to prevent tunnelling of water along the interface.
36. All overflow pits within the bioretention devices must be provided with letterbox
type grates in accordance with IPWEAQ Standard Drawing WSUD-001.
37. A minimum of five of the following species must be planted in the bioretention
basin surface at a minimum density of 8 plants/m2:
a. Carex appressa.
b. Carex fascicularis.Ficinia nodosa.
c. Juncus usitatis.
d. Lomandra longifolia.
e. Ghania sieberiana.
38. Where landscaping/garden beds are proposed adjacent to the bioretention
basin, a 900mm deep root barrier must be installed to the interface between the
landscape/garden area and the bioretention basin.
39. Following Construction - Prior to issuing of a final compliance certificate, council
must receive evidence that the results for the in situ hydraulic conductivity
testing conducted in accordance with PRACTICE NOTE 1: In Situ
Measurement of Hydraulic Conductivity (FAWB, April 2008) for the bioretention
filter media achieve the design criteria.
40. Maintenance - All stormwater quality treatment devices must be maintained in
accordance with the Maintaining Vegetated Stormwater Assets, Version 1
(Water by Design, 2009). Records of all maintenance activities undertaken
must be kept and made available to council upon request.
Erosion and Sediment Control
41. Erosion and sediment control measures must be installed and maintained to
minimise erosion on the site and to minimise the export of sediment and
associated pollutants from the site. The erosion and sediment control measures
must be designed, installed and maintained in accordance with current best
practice standards.* Any waters discharged from the site in a 43mm rainfall
event or less must contain less than 50mg Total Suspended Solids per Litre.
(*refer to advisory notes)
Page 12 of 32
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.