ORDINARY MEETING AGENDA 15 JANUARY 2015
42. Prescribed Water Contaminants (as defined in the Environmental Protection Act
1994) must not be released from the site or to waters within the site, or be likely
to be released should rainfall occur, unless all reasonable and practicable
measures as detailed within the International Erosion Control Association Best
Practice Erosion and Sediment Control Document (2008) are taken to prevent
or minimise the release and concentration of contamination.
43. Prior to the the issue of the Certificate of Classification, all site surfaces must be
effectively stabilised using methods which have achieved effective short-term
stabilisation and which will continue to achieve effective stabilisation in the
medium to long-term (refer to advisory notes). For the purpose of this condition,
an effectively stabilised surface is defined as one that does not, or is not likely
to result in visible evidence of soil loss caused by sheet, rill or gully erosion or
lead to sedimentation, or lead to water contamination.
44. Any exposed areas must be effectively stabilised without delay and prior to
rainfall occurring.
Works Within Road Reserve/Reinstatement
45. Safe pedestrian access on all streets in the vicinity of the development must be
maintained at all times. Should footpath/road closures be necessary to carry out
construction works, Council’s Engineering Officer must be notified prior to the
proposed closure and all requirements complied with.
46. All frontage works must match neatly with existing road and verge/footpath
features. Additional works beyond the frontage may be required to provide an
acceptable transition to existing road and verge/footpath profiles. In this regard,
any sections of the footpath in the common property frontage of the site that is
either damaged or missing must be replaced as part of these works.
Site Access and Driveways
47. Any existing unnecessary or redundant property accesses must be removed,
and the kerb, footpath and verge area reinstated to match the existing footpath
and/or verge treatments. Grassed verge areas to be reinstated must be
provided with 100 mm topsoil and grass seed or turf, and must be maintained
by the developer until established.
48. The following must be complied with during the construction of the required
crossover/driveway:
a. The driveway must be constructed so as not to concentrate stormwater
runoff onto neighbouring properties or cause ponding of water within the
road reserve
Earthworks
49. The finished surface levels of the site must be graded and shaped to ensure
that all surface runoff is directed to the proposed drainage system and not
directed on to any adjoining property.
50. All earthworks shall be undertaken in accordance with the provisions of AS
3798 Guidelines on Earthworks for Commercial and Residential Development.
Certification must be provided by an RPEQ and submitted to Council the issue
of the Certificate of Classification for the building.
Service Conduits under Existing Road Features
51. Electrical conduits or other services proposed to be installed under existing
sealed carriageways, concrete pathways or concrete/sealed driveways must be
installed by boring. Trenching is not permitted, unless specifically approved by
Council.
Page 13 of 32
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.