Skip to the record
Accept no substitutions.

Original source · versioned page text

2015-01-15 Ordinary Meeting Agenda

of 32

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

ORDINARY MEETING AGENDA                                                     15 JANUARY 2015


              Supervision/Certification
        52.   Upon completion of the work a certificate must be issued by an RPEQ certifying
              that the works have been constructed in accordance with the Operational
              Works permit.
              Landscaping
        53.   The finished level of all mulch in garden beds must be a minimum of 50mm
              below the level of the adjacent top of pavement. All landscaping is to be
              constructed in accordance with Council’s Planning Scheme Policy PSP03
              Landscaping Plants and Guidelines.
        54.   All approved landscaping works must be maintained in good condition for the
              duration of the approved use.
        55.   All landscape works must be constructed and work procedure undertaken in
              accordance with:
              a.   The approved plan and conditions detailed in this Decision Notice.
              b.   All relevant council Planning Scheme Policies, standard drawings,
                   standard specifications and guidelines.
        56.   Landscape works must be supervised, constructed and certified by qualified
              persons*. (* Refer to Advisory Note)
        Advisory Notes
              Qualified Person – Landscaping
        1.    For the purpose of supervising landscape works and preparing a landscape
              certification, is considered to be a landscape architect, landscape designer or
              horticulturist with a minimum of three years current experience in the field of
              landscape design.
              Equitable Access and Facilities
        2.    The plans for the proposed building work have NOT been assessed for
              compliance with the requirements of the National Construction Code - Building
              Code of Australia (Volume 1) as they relate to people with disabilities. Your
              attention is also directed to the fact that in addition to the requirements of the
              National Construction Code as they relate to people with disabilities, one or
              more of the following may impact on the proposed building work:
              a.    the Disability Discrimination Act 1992 (Commonwealth);
              b.    the Anti-Discrimination Act 1991 (Queensland); and
              c.    the Disability (Access to Premises – Buildings) Standards.

              Development Compliance Inspection
        3.    Prior to the commencement of the use, please contact Council's Development
              Assessment to arrange a Development Compliance Inspection.
              Infrastructure Charges
        4.    This Development Permit will trigger an “Infrastructure Charge Notice” to be
              issued in accordance with Council’s “Adopted Infrastructure Charges
              Resolution” under the State Planning Regulatory Provision (Adopted Charges)
              and the Sustainable Planning Act 2009.
              General Advisory Notes
        5.    Council has undertaken an audit check of the Operational Works drawings in
              relations to the proposed works. A detailed check of the calculations and
              drawings has not been undertaken, as they have been certified by a RPEQ.
              The RPEQ bears full responsibility for all aspects of the engineering design.

                                                                                 Page 14 of 32
Log in to download the original file

2015-01-15 Ordinary Meeting Agenda(PDF, 855KB).pdf · 875 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.