2020-07-07 P&E Agenda - Item 3 - Attachment 1 - TNC Project Management Plan
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn To improve the environmental health of the Noosa River Estuary through active restoration
Project Goal and conservation activities that engage the Noosa Community in meaningful conservation
and support economic and community wellbeing.
Expected
Party
completion date
responsible
Objectives Deliverables (from 1 July 2019 Measurable outcomes
for
unless otherwise
Deliverable
stated)
(A3.1) Community, industry
A-3 Community
and stakeholder
engagement
consultation to identify Records of public and
most appropriate stakeholder consultation, TNC &
Strengthen
community volunteering 18 months including one-on-one Noosa
community
opportunities (e.g. shell meetings, open forums, Council
interest, support
recycling, oyster gardens, media, etc.
and participation
oyster watch, video
in Noosa River
monitoring).
restoration by
(A3.2) Establish at least one
establishing a Record of volunteer hours
community volunteering
community dedicated to community
program identified from the
volunteering volunteering programs, such
above process which takes 18 months TNC & NSC
program to as: shell recycling, oyster
into account current and
support oyster gardens, oyster watch, video
future resources,
restoration monitoring.
management and interest.
(A4.1) Restoration at two
sites (approx. 40m-50m At least two (2) sites with at
shore length per site) which least overall 80m shore
24 months
tests oyster substrate length of oyster ecosystem TNC
design, configuration and restored and being actively
deployment methods and monitored.
A-4 Oyster oyster growth and survival.
ecosystem In addition to the two pilot
(A4.2) Restoration across
restoration sites, a number of sites
multiple sites, as
comprising a minimum of a
determined by restoration 36 months
Restore oyster further aggregated 600m2 TNC
suitability modelling and
ecosystems surface area of restored
outcomes of community
across the lower oyster ecosystems in the
consultation.
estuary Noosa River estuary.
(A4.3) Monitoring and
evaluation study for both
Ongoing for Annual monitoring and
pilot and full restoration
duration of evaluation report card with
sites. Monitoring to include TNC
project, at least 6 monthly status reports to
oyster metrics,
6 monthly be provided.
invertebrates and fish use
(detailed in MER plan).
(A5.1) Run workshop with
A-5 Noosa River
NSC to identify ongoing
Plan 9 months Workshop completed. TNC & NSC
focus areas for TNC
support.
14
BRING BACK THE FISH: PROJECT MANAGEMENT PLAN
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.